BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in South Hero, Vermont. Design plans call for the construction of a 3,000-square-foot municipal facility.

The Town of South Hero is seeking proposals from qualified firms for all architectural and engineering services necessary for the design, bidding, and construction administration for a new Town Office Building on a parcel of land located within the South Hero Village Zoning District. The South Hero Town Office currently occupies approx. 3,000 sq. ft. at 333 US Route 2 in the South Hero Village District. There has been a need for increased storage, office, and meeting space within the Town Office for many years. In 2023 an existing conditions survey identified structural and environmental deficiencies in the existing town office, ultimately concluding the building to be beyond repair. In 2024 the town formed a Town Office Committee to define the needs, examine options, solicit public input, contract for professional services, and make recommendations to the Select Board regarding a new Town Office. The Committee recently completed a comprehensive feasibility study which concluded that a new Town Office should be created on the same parcel as the existing town office. A possible site layout has been included in this RFP and is labeled "Site A" on the attached site plan. Question Deadline 09/06/2024 at 4:30 PM ET If respondents have questions or want to register as an interested party to receive addendums, please email: townadmin@southherovt.org and sh.townofficebuilding@gmail.com no later than. Answers to all questions will be released via addendum to all interested parties. The Committee is now seeking proposals from qualified firms for all architectural and engineering services necessary for the design, bidding and construction administration for a new Town Office Building. These services would be provided in two (2) separate phases and as described below in Section IV

Design

Municipal

$277,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
94
Bidding Soon
1,621
All Active Projects
643
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2025

img_map_placeholder

333 US-2, South Hero, VT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.