Site work for a communication facility in Troy, Missouri. Completed plans call for site work for a communication facility.
The new communications tower and tower related work for the new Lincoln County 911 Dispatch/EOC Center located at 911 Professional Parkway, Troy, MO 63379 All questions relating to the RFP are to be addressed by NAVIGATE Building Solutions, Ray Hutsel, 8419 Manchester Road, Brentwood, MO 63141, 636-212-1556 or ray@navigatebuildingsolutions.com. The anticipated scope of work is as follows: 1. Tower and tower related work final design, contract, delivery, installation, startup, testing, and warranty work a. Prepare final design and proposal to furnish, deliver, and install the new tower and tower related work, including the tower foundations and structure for the cables from the tower to the building. Submit for review and approval by LCES, NAVIGATE, and JEMA. b. Provide final submittals (approval drawings, product information, operating and maintenance information, MSDS sheets, if applicable) for approval by LCES, NAVIGATE, and JEMA. c. Distribute approved submittals to the GC for their use in coordinating final construction and installation requirements. d. Working with LCES, apply for and obtain all required permits for installation of the new tower and tower related work. e. Schedule final fabrication and delivery of the new tower and tower equipment according the project timeline. f. Inspect all deliveries for shortages or damage and in conjunction with LCES and the GC. g. Design, furnish, and install complete the new tower foundations. h. Design, furnish, and install complete the new cable structure (ice bridge) from the tower to the building. Coordinate entrance into the building exterior wall at the rated storm structure shroud. 3 i. Provide the cable tray from the exterior wall entrance point to Comm/Data Room 134. j. Provide all grounding work for the tower and tower work per Motorola R56 grounding requirements and Exhibit C. k. Provide all tower mounted equipment and cabling from the tower to Comm/Data Room 134. l. Provide all labor, material, equipment, and supervision to deliver, set up, install, and test the new tower and tower related work on site as specified in accordance with the final contract documents. m. Coordinate and schedule all work with LCES and the GC. n. Provide cleanup for own operations. o. Upon substantial completion of the tower and tower related work, create a punch list. Retainage will not be released until punch list has been resolved to LCESs satisfaction. p. Final walk through, testing, inspection, training of owner personnel, and acceptance of project with LCES and NAVIGATE. q. 9-month warranty walk-through and review, in time to allow any corrections prior to the one year warranty expiration date. r. Work by others: i. Site grading for the tower to elevation 539.25 as shown on Drawing C4.0 - Site and Grading Plan. ii. Tower location per Drawing C4.0 - Site and Grading Plan. iii. Security fence, gate, and landscape rock called out on Drawing L-200. iv. All testing will be by the Owners Third Party Testing company, PSI. v. Control cabinets, racks, wireways in Comm/Data 134 by GC. vi. Tower and tower equipment rack and control cabinet mounted equipment/devices will be provided by the Owner. vii. Update and/or obtain licenses by Owner.
Post-Bid
Communication
$139,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2024
October 10, 2024
911 Professional Parkway, Troy, MO
Related To This Project
Troy, MO
--
Troy, MO
--
Troy, MO
Bid Date: Nov 22 2024
Troy, MO
Bid Date: Aug 27 2024
Troy, MO
Bid Date: Aug 08 2024
Troy, MO
Bid Date: Aug 08 2024
Troy, MO
Bid Date: Jul 23 2024
Troy, MO
Bid Date: Jun 25 2024
Troy, MO
Bid Date: Nov 19 2024
Troy, MO
Bid Date: Jun 28 2024
Troy, MO
Bid Date: May 03 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.