BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Collierville, Tennessee. Completed plans call for site work for a water / sewer project.

This project consists of the clearing of a section of ditch bank and stabilization of said ditch bank by the installation of Scourlok and Armormax bank stabilization products (or approved equal), grading and sodding and other items of work as called for in the contract documents as required for a completed project. As a part of doing business with the Town of Collierville, Tennessee, each individual, company or organization is required to obtain a Vendor Number to reference when requesting a copy of any bid. The Vendor will also be required to reference its Vendor Number on the Bid Response Form. The Vendor Number may be obtained by online and registering as a Town of Collierville vendor at online If you are a registered vendor of the Town of Collierville, but have forgotten or misplaced your vendor number, please visit online If you have any questions regarding the Vendor Number, please call the Procurement Division at (901) 457-2250. The default method of delivery of the Bid Packet will be an emailed DropBox link. All Bid Packets will be provided in PDF format. Bidders will be responsible for any printing required. Otherwise the following charges will apply: $0 for Disk or $50.00 if print copy requested Project Description This project consists of the clearing of a section of ditch bank and stabilization of said ditch bank by the installation of Scourlok and Armormax bank stabilization products (or approved equal), grading and sodding and other items of work as called for in the contract documents as required for a completed project. 2. Scope of Services A. Provide all items of work, labor and materials as called for in the contract documents. B. Submit construction schedule at pre-construction conference and list all items with long lead times. C. Insure that work is clear of encroachment into property outside of easements or right of ways. D. Contractor is to assume full responsibility for the safety and protection of all persons, property and materials associated with his/her work. E. It is the contractors responsibility to ensure that traffic control meets current MUTCD requirements.

Award

Water / Sewer

$352,065.00

Public - City

Site Work

27

24

9

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
30
Bidding Soon
425
All Active Projects
194
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 18, 2024

October 18, 2024

img_map_placeholder

Peterson Lake Cove, Collierville, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.