Published October 10, 2024 at 8:00 PM
Updated October 11, 2024
Site work for a civil project in Rockford, Michigan. Completed plans call for site work for a water / sewer project.
The project consists of furnishing all material and constructing improvements to Pinehurst Lift Station, including the following: Two (2) pumps, 4-inch piping and valves, air release manhole, 6-inch bypass connection, control panel and pad, and precast structure lids. All associated demolition, equipment, electrical, instrumentation, controls, bypass operation, site work, and restoration. The work to be performed under this contract will be paid for with local funds. Question Deadline 09/12/2024 The Owner reserves the right to reject any or all bids and to waive any irregularities in bidding. No bid may be withdrawn after the scheduled closing time for receiving bids for at least one hundred twenty (120) days thereafter. Construction activities are to begin as soon as possible following contract award. It is the intent of the Owner to consider award of the contract to the successful bidder at the September 23,2024, Township Board Meeting. The work covered by the Contract Documents consists of improvements to Pinehurst Lift Station, located at 7041 Pinehurst Lane, Rockford, MI 49341. Included in this work is furnishing all supervision, labor, materials, equipment, activities and related costs necessary for completing the improvements. The project consists of furnishing all material and constructing improvements to Pinehurst Lift Station, including the following: Two (2) pumps, 4-inch piping and valves, air release manhole, 6-inch bypass connection, control panel and pad, and precast structure All associated demolition, equipment, electrical, instrumentation, controls, bypass operation, site work, and restoration. B. The Contractor must visit the site of the work and must completely inform himself relative to construction hazards and procedure, labor, and all other conditions and factors, local and otherwise, which would affect execution and completion of the work and its cost. Such considerations must include the arrangement and condition of the existing structures and facilities, the availability and cost of labor and facilities for transportation, handling and storage of materials and equipment. All such factors must be properly investigated and considered in the preparation of the Contractor's proposal. There will be no subsequent financial adjustment for lack of such prior information. C. The Contractor must guarantee all equipment and work for one year from the date of substantial completion.
Award
Water / Sewer
$521,750.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.