BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a road / highway in Miami, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Counties: Miami-Dade Road Name: SR 959 (Red RD) (SW-NW 57Th Ave) Limits: From N of Sw 8th St to N of Nw 111th St Project(s): 44780415201(*) Federal Aid No: D624035B Project(s): 44780415601 Federal Aid No: D624035B Total Roadway Length: 1.253 Miles Total Bridge Length: 0.016 Miles Total Proposal Length: 1.269 Miles Contract Days: 240 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Days Please read the full advertisement Description: The Improvements Under This Contract Consist of Resurfacing Along State Road 959/red Road/swnw 57th Avenue From North of Southwest 8th Street to North of Northwest 11th Street in Miamidade County. Question Deadline 09/18/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 016 - Resurfacing - SR 959 (Red Rd)

Award

Roads / Highways

$2,627,713.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
48
Bidding Soon
1,090
All Active Projects
451
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2024

October 4, 2024

img_map_placeholder

Red Rd, Miami, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.