BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Memphis, Tennessee. Completed plans call for the renovation of a detention facility.

The contractor will provide labor, equipment andmaterials needed to complete the EST4 project. The contractor will remove the Fire Alarm system components associated with the current EST 3 Fire Alarm system that will be replaced with the EST 4 upgrade. The contractor will install the new EST 4 Fire Alarm system at building I containing: The Federal Bureau of Prison (FBOP), Federal Correctional Institution Memphis, TN is a facility with a rated capacity of 862 low-security inmates within a secure perimeter fence. The current Edwards EST3 Fire Alarm System at FCI Memphis is being upgraded to EST 4 due to being unreliable and problematice. Building 1 has a booster system currently from the adjacent Building B to include pull stations, horns, and strobes. The building was a factory and now being reappropriated to a programming unit for the inmate population.

Post-Bid

Jails / Prisons

$75,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
88
Bidding Soon
764
All Active Projects
332
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 29, 2024

September 30, 2024

img_map_placeholder

1101 John A Denie Rd, Memphis, TN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.