BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Memphis, Tennessee. Completed plans call for site work for a playground / park / athletic field.

Pine Hill Playground Improvements Minority/Small Business Participation Goal: MBE: 44% & WBE: 6% Award of contracts will be made on the basis of the lowest and best bids as determined by the City of Memphis. A bid bond is required if bid amount is $100,000 or more Any protest of award must be filed in writing with the Purchasing Agent within TEN (10) days of the award announcement. PROJECT DESCRIPTION Frayser Park project consists of the following scope of work: clearing and grubbing for the installation of a playground within an existing park (Frayser Park) that includes: tree/shrub removal, metal pole removal, utility pole/service relocation, as well as removal of concrete pad & curbing. The project includes the installation of two large play structures, and two sets of swings, rubberized safety surfacing (with subsurface drainage system), seatwalls, concrete sidewalks, trails, concrete flush grade beams, site grading, landscaping and re-cladding of an existing trash enclosure. The project also includes erosion control measures, tree protection fencing, construction fencing and gravel construction access area/pad. All demolition debris will be removed from the site and disposed of in a legal manner. A 100% stand of grass will be required prior to project completion being obtained. Pine Hill Park project consists of the following scope of work: clearing & grubbing for the installation of a playground within an existing park (Pine Hill Park) that includes: tree removal, metal pole removal, removal of concrete & asphalt paving, and concrete curbing. The project includes the installation of two large play structures, and two sets of swings, rubberized safety surfacing (with subsurface drainage system), seatwalls, concrete sidewalks/trails, concrete flush grade beams, site grading, landscaping and new roadway alignment and asphalt paving. The project also includes erosion control measures, tree protection fencing, construction fencing and gravel construction access area/pad. All demolition debris will be removed from the site and disposed of in a legal manner. A 100% stand of grass will be required prior to project completion being obtained Addendum #1-#2 have been issued as of 9-18-2024.

Post-Bid

Playgrounds / Parks / Athletic Fields

$800,000.00

Public - City

Site Work

23

12

11

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
29
Bidding Soon
424
All Active Projects
189
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 2, 2024

November 1, 2024

img_map_placeholder

2907 N Watkins St, Memphis, TN


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.