BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a playground / park / athletic field in West Palm Beach, Florida. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

Bill Moss Hillcrest Paseo Park Soccer Field Drainage and Grading Improvements. One (1) original, one (1) electronic version and one (1) copy of the Bid shall be submitted by the submittal deadline. Bids shall be placed in a sealed envelope, marked in the lower left-hand corner with the solicitation number, title, submittal deadline date and time. Self-Performance Requirement: The selected Bidder shall be required to commit to self-perform 25% of the work (labor) on the Project. License: The Bidder will be required to have at the time of bid submittal a State of Florida Certified Pesticide License for Ornamentals and Turf. Question Deadline 09/09/2024 at 5:00 PM ET Questions or requests for information regarding this solicitation, should be addressed only online. Liquidated Damages. If the actual completion date for substantial completion or final completion occurs later than the time indicated in the Contract Documents or later than the scheduled completion date if a duly authorized change order for time is issued, liquidated damages in the amount(s) set forth in the Contract Documents shall be paid by Contractor for unexcused delay in performance of the Work. Project Description The following Project description is for general information only and should not be construed to be a complete description of all Work required. Reference should be made to Exhibit A "Engineering Plans Grading & Drainage Improvements". The goal of the project is to kill the existing grass and weeds, grade the existing soil to meet the cut/fill goals as per the grading plan, homogenize the existing root zone soil to breakup the layers, bury all organic and inorganic debris, import the recommended root zone sand or 90/10 mix to meet proposed finished grades, homogenize the mix and existing soil to a depth of 6-8 inches, sprig with Celebration Bermuda grass and 'grow-in' the new stand of turfgrass throughout the fall, winter and early spring to prepare the field for play in the spring of 2025. Final completion shall be on or before October 31, 2025. The estimated project amount is roughly $330,000.00. M/WBE's are encouraged to participate in the bid process. SCOPE OF WORK The City of West Palm Beach (City) is accepting bids from qualified and responsible Contractors to furnish and be responsible for all labor (including costs for overtime, nights, weekends, holiday and multiple phasing work), material, construction equipment and machinery, transportation, tools, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals, including supervision, servicing, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit necessary to perform the Bill Moss Hillcrest Paseo Park soccer field drainage and grading improvements Project Work as shown in the engineering plans and described in the solicitation documents for the project. Project Summary The existing soccer field has a root zone soil that is layered with unacceptable internal drainage to a depth of approximately eight (8) inches. In addition, the grades undulate throughout the field with a swale near the north end and numerous flat or low areas that hold water. As a result, the playability of the field has been reduced and it has been difficult to establish an adequate stand of grass to support wear from the soccer program. Site: Bill Moss Hillcrest Paseo Park, 3401 Parker Avenue, West Palm Beach, FL 33405.

Award

Playgrounds / Parks / Athletic Fields

$366,400.00

Public - City

Paving, Site Work

8

5

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
49
Bidding Soon
1,124
All Active Projects
503
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 27, 2024

October 28, 2024

img_map_placeholder

3401 Parker Ave, West Palm Beach, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.