Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a playground / park / athletic field in West Palm Beach, Florida. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.
Bill Moss Hillcrest Paseo Park Soccer Field Drainage and Grading Improvements. One (1) original, one (1) electronic version and one (1) copy of the Bid shall be submitted by the submittal deadline. Bids shall be placed in a sealed envelope, marked in the lower left-hand corner with the solicitation number, title, submittal deadline date and time. Self-Performance Requirement: The selected Bidder shall be required to commit to self-perform 25% of the work (labor) on the Project. License: The Bidder will be required to have at the time of bid submittal a State of Florida Certified Pesticide License for Ornamentals and Turf. Question Deadline 09/09/2024 at 5:00 PM ET Questions or requests for information regarding this solicitation, should be addressed only online. Liquidated Damages. If the actual completion date for substantial completion or final completion occurs later than the time indicated in the Contract Documents or later than the scheduled completion date if a duly authorized change order for time is issued, liquidated damages in the amount(s) set forth in the Contract Documents shall be paid by Contractor for unexcused delay in performance of the Work. Project Description The following Project description is for general information only and should not be construed to be a complete description of all Work required. Reference should be made to Exhibit A "Engineering Plans Grading & Drainage Improvements". The goal of the project is to kill the existing grass and weeds, grade the existing soil to meet the cut/fill goals as per the grading plan, homogenize the existing root zone soil to breakup the layers, bury all organic and inorganic debris, import the recommended root zone sand or 90/10 mix to meet proposed finished grades, homogenize the mix and existing soil to a depth of 6-8 inches, sprig with Celebration Bermuda grass and 'grow-in' the new stand of turfgrass throughout the fall, winter and early spring to prepare the field for play in the spring of 2025. Final completion shall be on or before October 31, 2025. The estimated project amount is roughly $330,000.00. M/WBE's are encouraged to participate in the bid process. SCOPE OF WORK The City of West Palm Beach (City) is accepting bids from qualified and responsible Contractors to furnish and be responsible for all labor (including costs for overtime, nights, weekends, holiday and multiple phasing work), material, construction equipment and machinery, transportation, tools, appliances, fuel, power, light, telephone, water, sanitary facilities, temporary facilities and all other facilities and incidentals, including supervision, servicing, taxes, bonds and insurance, permitting fees, traffic control, security, miscellaneous costs, warranties, general conditions, overhead and profit necessary to perform the Bill Moss Hillcrest Paseo Park soccer field drainage and grading improvements Project Work as shown in the engineering plans and described in the solicitation documents for the project. Project Summary The existing soccer field has a root zone soil that is layered with unacceptable internal drainage to a depth of approximately eight (8) inches. In addition, the grades undulate throughout the field with a swale near the north end and numerous flat or low areas that hold water. As a result, the playability of the field has been reduced and it has been difficult to establish an adequate stand of grass to support wear from the soccer program. Site: Bill Moss Hillcrest Paseo Park, 3401 Parker Avenue, West Palm Beach, FL 33405.
Award
Playgrounds / Parks / Athletic Fields
$366,400.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 27, 2024
October 28, 2024
3401 Parker Ave, West Palm Beach, FL
Related To This Project
West Palm Beach, FL
Bid Date: Sep 06 2024
West Palm Beach, FL
Bid Date: Sep 27 2024
West Palm Beach, FL
Bid Date: Oct 14 2024
West Palm Beach, FL
Bid Date: Sep 12 2024
West Palm Beach, FL
Bid Date: Dec 18 2024
West Palm Beach, FL
Bid Date: Sep 27 2024
West Palm Beach, FL
Bid Date: Sep 05 2024
West Palm Beach, FL
Bid Date: Sep 24 2024
West Palm Beach, FL
Bid Date: Sep 24 2024
West Palm Beach, FL
Bid Date: Oct 22 2024
West Palm Beach, FL
Bid Date: Jun 18 2021
West Palm Beach, FL
Bid Date: Oct 31 2024
West Palm Beach, FL
Bid Date: Aug 25 2024
West Palm Beach, FL
Bid Date: Sep 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.