Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 27, 2024 at 8:00 PM
Updated September 28, 2024
Site work for a playground / park / athletic field in Cotati, California. Completed plans call for site work for a playground / park / athletic field.
Putnam Park Improvements Phase 1 Project proposes to update and renovate an existing 8.8-acre park in south-east Cotati. The project scope includes adding a new fenced dog park, constructing a new paved group picnic area, adding a new (approximately) 300 square foot concession building to serve the existing ball fields, and constructing hardscaped seating areas, pedestrian walkways and ADA compliant pedestrian paths throughout the site, including around the perimeter of the park. These paths are proposed to be constructed of a combination of concrete and "granitecrete" paving and will be served by park amenities such as exercise equipment, stone seat walls and trash receptacles. The existing restroom structure is being demolished and replaced with a new four-stall restroom building in the same location and will utilize the existing utility service connections in this location. One on-site tree located in the south-west quadrant of the park is proposed to be removed, with all remaining trees proposed to be protected during construction activities. Existing lawn and landscaping are proposed to be replaced with new turf and plantings. All existing irrigation is being removed and replaced but will continue to be served by the existing 6'' water line serving the property from the city water main. New parking lot lighting and pedestrian bollard lights are proposed to serve the updated facilities. The project design plans anticipate a three-phased construction schedule however this analysis covers all phases currently designed. All construction activities are proposed in previously For further information, contact the Public Works Department at (707) 665-4238, Craig Scott, 201 West Sierra Avenue, Cotati, California, 94931-4217. Technical questions will be accepted via e-mail only at ric@integrapla.com. Technical questions will not be accepted after 4:00pm on 9/11/2024
Bid Results
Playgrounds / Parks / Athletic Fields
$1,888,340.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 17, 2024
November 18, 2024
153 Myrtle Ave, Cotati, CA
Related To This Project
Cotati, CA
Bid Date: Jul 01 2025
Cotati, CA
Bid Date: Mar 04 2025
Cotati, CA
Bid Date: Aug 05 2025
Cotati, CA
--
Cotati, CA
Bid Date: Sep 19 2024
Cotati, CA
Bid Date: Aug 27 2024
Cotati, CA
--
Cotati, CA
--
Cotati, CA
Bid Date: May 11 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
