BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, new construction, renovation and addition to a mixed-use development in Cheyenne, Wyoming. Completed plans call for the addition of a service station / car wash facility; for the demolition of a service station / car wash facility; for the construction of a service station / car wash facility; for the renovation of a service station / car wash facility; for site work for a service station / car wash facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; pre-engineered storage facility; and pre-engineered storage facility.

The work includes, but is not limited to, the construction of a new livestock barn and the setting up of a classroom modular building. Site preparation will have to be made for both structures and accommodation for site drainage correcting the direction of storm water. The Livestock barn will include structural items, concrete foundations, slab on grade, wood framed construction, insulated ceilings, interior finishes, livestock pens, hydrants, waterers, and wash bay. Work will also include installation of overhead doors, livestock and personnel doors and hardware. The new structure will also have power and power distribution, extension of the existing water supply to the new building with appropriate drainage. Existing site components may be modified to accommodate the footprint of the new structure and pens. The classroom modular is currently located at Cheyenne Regional Airport, and will require disconnection from existing services, and relocated to the new site. Removal of the existing stairs, ramps and associated components for reinstallation. Site preparation will include, but not limited to, removal of existing corrals and pens. The designated area preparation will include earth work, site grading for drainage, preparation of pad or structural elements that will provide a solid base for the modular placement. Installation of a septic system and drain field and connection to the water supply for existing restrooms and sinks. The existing EPDM roof will need to be assessed and prepared for the relocation and will include the repairs necessary to provide a watertight roof. Power will be provided to meet the needs for the classroom setting, mechanical, and life safety systems, with technology and data requirements to meet district standards and needs. Interior finishes will be brought to like new appearance and will include the replacement of ceiling tiles with new, replacement of any damaged items that are to remain, and the replacement of the existing carpet with new flooring. Verification that all components are functioning according to their intended purpose. Exterior finishes of newly constructed building and modular will be like that of the existing structures. The site will accommodate pull-out areas as well as student parking. A new road base will be applied to the whole site to minimize the mud on site, as well as to help direct storm water mitigation. Cattle guard at the property line grate need to be lifted to allow access for cleaning a then reinstation.

Award

Service Station / Car Wash

$1,216,922.00

Public - County

Addition, Demolition, New Construction, Paving, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
15
Bidding Soon
326
All Active Projects
129
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

October 10, 2024

img_map_placeholder

1705 W Riding Club Rd, Cheyenne, WY

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.