BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Santa Barbara, California. Completed plans call for site work for a water / sewer project.

**As of October 22, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Scope of Services Private property owners within the City of Santa Barbara occasionally need to have their sewer laterals repaired, abandoned, or through development, install new sewer laterals. Historically, these property owners have hired a private plumbing contractor who on their behalf obtained a public works permit, and performed the lateral inspection and repair work, which involved exposing the sewer lateral connection. The City has contracted out the sewer lateral services but does not contract out to the property owners private contractor. At this time, the City wishes to build upon the current mode of operation and offer property owners the ability to have the Citys contractor perform all associated work to repair, replace, abandon, or add new sewer tap or connection, including excavation and paving. The initial contract will be for a one (1) year period from the date of the award. This contract can be renewed by mutual consent for 4 additional one-year terms. The maximum term shall not exceed 5 years from the date of award. Liquidated Damages $1000 per day Question Deadline 09/03/2024 at 12:00 PM PT License Requirements A Project Type Bid Response Types Line Items, Subcontractor, Bid Bond Section 1.3 Bid Submittals, Items A, C, D, and F (required) Type of AwardLump Sum The Bid Proposal must be accompanied by bid security of ten (10) percent of the maximum bid amount, in the form of a cashiers or certified check made payable to City, Performance and Payment Bonds. The successful bidder will be required to provide separate performance and payment bonds for 100% of the Contract Price regardless of contract dollar amount. The estimate for this Project is $600,000.00

Bid Results

Water / Sewer

$528,800.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
28
Bidding Soon
544
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2024

October 17, 2024

img_map_placeholder

Multiple Locations, Santa Barbara, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.