Site work and paving for a sidewalk / parking lot in E Cleveland, Ohio. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Question Deadline 09/06/2024 at 3:00 PM ET Written questions must be submitted via online and Questions received shall be answered by Cleveland Metroparks by Monday, September 9, 2024 by 3:00 p.m. (EST), via online Edgewater Beach Parking Lot: 1. Sawcutting and removal 1. Sawcutting and removal of 200 sy of asphalt all purpose trail and aggregate base and 80 lineal feet of 2'x2' buried concrete foundation. 2. Excavation and construction of 10,700 sfof vegetated bioswale. 3. Installation of 310 lineal feet of 10" perforated underdrain and 2 precast manhole structures. 4. Construction of 215 sy ofrerouted full depth asphalt all purpose trail with aggregate base consisting of 24 cy of 301 asphalt base and 12 cy of asphalt surface course. 5. Grading and placement of 1,190 cy ofmodified biosoil mix in bioswale bottom. 6. Grading and placement of 140 cy of clean topsoil with seeding and straw. 7. Grading and placement of 17,600 sfof grass sod placement on bioswale bottom and banks. 8. Straw waddles, screen barriers, and any other stormwater pollution prevention measures as required Lakefront Administration Parking Lot: 1. Sawcutting and removal of 194 sy of asphalt parking lot and aggregate base. 2. Excavation and construction of 2,440 combined sf of vegetated bioswale. 3. Installation of 20 lineal feet of 6" HDPE STS, 255 lineal feet of 8" HDPE STS, 290 lineal feet of 10" HDPE STS, 40 lineal feet of 12" HDPE STS, and 110 lineal feet of 6" perforated underdrain. 4. Installation oftwo CB2-3 precast outlet structures, one CB2-2B precast catch basin, and three HW-4B precast headwalls. 5. Replacement of 194 sy offull depth asphalt parking lot pavement after storm sewer installation. 6. Grading and placement of combined 275 cy ofmodified biosoil mix in bioswale bottoms. 7. Grading and placement of 50 cy of clean topsoil with seeding and straw. 8. Grading and placement of combined 6,075 sfofgrass sod placement on bioswale bottom and banks.

Bid Results

Sidewalks / Parking Lot

$403,347.00

Public - City

Paving, Site Work

14

8

4

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
38
Bidding Soon
968
All Active Projects
352
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2024

September 30, 2024

img_map_placeholder

16301 Lakeshore Blvd, E Cleveland, OH

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.