Renovation of a mixed-use development in Hopewell Junction, New York. Completed plans call for the renovation of a educational facility.

Roy C. Ketcham High School 99 Myers Corners Road, Wappingers Falls S.E.D. Proj. #13-21-01-06-0-012-039 John Jay Senior High School 2012 Route 52, Hopewell Junction S.E.D. Proj. #13-21-01-06-0-020-043 Van Wyck Junior High School 10 Hillside Lake Road, Wappingers Falls S.E.D. Proj. #13-21-01-06-0-017-027 Wappingers Junior High School 30 Major MacDonald Way, Wappingers Fall S.E.D. Proj. #13-21-01-06-0-004-036 Fishkill Elementary School 20 Church Street, Fishkill S.E.D. Proj. #13-21-01-06-0-005-021 Sheafe Road Elementary School 287 Sheafe Road, Wappingers Falls S.E.D. Proj. #13-21-01-06-0-018-022 Vassar Road Elementary School 174 Vassar Road, Poughkeepsie S.E.D. Proj. #13-21-01-06-0-008-026 Main Garage No.1 55 Major MacDonald Way, Wappingers Falls S.E.D. Proj. #13-21-01-06-5-007-009 Project Locations: Roy C. Ketcham High School (RCK) 99 Myers Corners Road, Wappingers Falls, NY John Jay High School (JJ) 2012 Route 52, Hopewell Junction, NY Wappingers Jr High School 30 Major MacDonald Way, Wappingers Falls, NY Fishkill Elementary School (FE) 20 Church Street, Fishkill, NY Sheafe Road Elementary School (SR) 287 Sheafe Road, Wappingers Falls, NY Vassar Road Elementary School (MC) 174 Vassar Road, Poughkeepsie, NY Main Garage No. 1/Transportation Offices Major MacDonald Way, Wappingers Falls, NY Question Deadline 09/23/2024 Prospective bidders may request clarification of the bid documents in writing addressed to Rhinebeck Architecture & Planning PC, attention Brian Gottschalk via e-mail Gottschalk.Brian@WSEinc.com. No interpretations of the meaning of the plans, specifications or other contract documents will be made to any bidder orally. Every question for such interpretations shall be in writing using the correct form, and must be received One (1) week prior to bid date in order to be considered. B. Temporary facilities and controls in the HVAC Work Contract include, but are not limited to the following: 1. Temporary facilities and controls that are not otherwise specifically assigned to other contracts. 1. Unpiped temporary toilet fixtures, wash facilities, and drinking water facilities, including disposable supplies. 2. Temporary enclosure for building exterior at louver and roof openings prior to installation of HVAC equipment as required to protect interior. 3. Excavation support and protection, unless required solely for the Work of another contract. 4. Special or unusual hoisting requirements for construction activities, including hoisting loads in excess of 2 tons, hoisting material or equipment into spaces below grade, and hoisting requirements outside building enclosure. 5. General waste disposal facilities. 6. Pest control. 7. Temporary fire-protection facilities. 8. Barricades, warning signs, and lights. 9. Security enclosure and lockup. 10. Environmental protection. 11. Restoration of Owner's existing facilities used as temporary facilities. C. Work in the HVAC Work Contract includes (furnish and install unless otherwise noted), but is not limited to, the following: 1. Include all HVAC Work. 2. Include all controls work as shown on construction documents. 3. Include any cutting, core drilling, removals and patching, caulking, firestopping as required to complete your work unless otherwise noted. 4. Include removal and re-installation of any existing construction as required to install new work including casework, ceilings and temporary support of light fixtures, smoke detectors etc. 5. All gas line work as shown in documents is by this contractor. 6. Access doors for HVAC equipment access are by HVAC contract and installed by GWC contractor. Coordinate all locations with GWC including at fire dampers at shafts around duct penetrations from first to second floor at VWJHS. 7. All new and retrofit roof curbs to be supplied and installed by HVAC contract. General Work contractor will cut openings in roof, provide blocking under curb to roof deck and flash curbs into existing roof systems. HVAC contract will remove and re-install all existing construction as required to install new steel supports and wood framing supports for all HVAC equipment including exhaust fans and MAU's. 8. VFD's, disconnects, starters etc. supplied by HVAC Contractor shall be installed by Electrical contractor unless otherwise noted. 9. Include removal of all HVAC rooftop equipment shown, temporary watertight protection and installation of new equipment. 10. Install duct detectors where shown, Electrical contract to provide and wire. 11. Include all exterior concrete pads below louvers. 12. Provide exterior concrete pads below UV louvers. 13. Include cutting, patching and painting all walls to match existing affected by HVAC removals unless shown under another contract. 14. Provide ductwork coordination drawings to mechanical engineer for approval prior to fabrication. 15. Include cutting back existing wood windows sills at new UV locations where required. 16. Patch and paint all exposed existing wall/ celling surfaces affected by HVAC removals. 17. District will hire commissioning agent, this contract shall coordinate and cooperate fully with requested submittal information and documentation. 18. Include providing access panels to GW contractor for installation including panels to access fire/smoke dampers at all Van Wyck Chases. 19. Include fire stop system at all ductwork/floor penetrations. 20. Include sealing up all openings resulting from duct/grille removals with construction to match existing at interior and exterior. Provide 2" thick insulated aluminum panels to infill openings at Van Wyck exterior wall above roof (4) locations. See note #8 on drawing VW MD-103 for location. 21. Include 2" thick insulated aluminum panels/caulking and sealant as required around new duct penetrations in exterior wall at Sheafe Road for new rooftop ductwork per detail L-9/SR A-100. 22. Provide prefabricated curb caps, plywood, insulation at all abandoned roof curbs, F.A.I. per detail N-17/A-003. 23. This contract to cut openings in walls as required to install new interior ductwork. 24. Provide and install all concrete slabs and stands for ground mounted ACCU units. Provide PVC enclosures for linesets into building. Provide concrete slabs under UV louvers. 25. Condensate drains for UV units etc. to exterior to be routed thru wall, with 1/2 " PVC tubing down turned and covered with PVC lineset covers. 26. Include relocation of kiln fume hoods, ductwork modifications etc as show on documents. 27. Include all gas piping interior and rooftop. 28. Infill all RTU curbs with (2) layers 5/8" gypsum board around ductwork and to inside of curb. Provide CFMF support as required for anchorage. 29. Include cutting all wall penetrations for new vent wall caps. 30. Include all interior concrete pads for pad mounted equipment in boiler room. 31. Provide Venture Clad or equal jacket system on all exterior ductwork. Wrap all gooseneck ducts thru roof with venture clad tape. 32. Exclude: Work identified under other contracts

Award

Educational

$332,487.00

Public - County

Renovation

123

27

58

7

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Manufacturer?s Field Services, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Commissioning, General Commissioning Requirements
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Acoustical Panel Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Markerboards, Tackboards, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Art, Furnishings and Accessories, Table Accessories, Ceramics, Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Instrumentation and Control Devices for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Ventilators
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Material Storage, Storage Equipment and Systems, Storage Cabinets

Find More Local Projects

Within 75 Miles of This Project
539
Active Projects
326
Bidding Soon
4,733
All Active Projects
2,166
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

November 26, 2024

img_map_placeholder

Multiple Locations, Hopewell Junction, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 District Wide Renovations Phase 2 Bid Plumbing Work - Contract P.2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.