Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Hillsboro, Ohio. Completed plans call for the renovation of a educational facility.
Submit all questions regarding this RFQ in writing to Procurement at procurement@ofcc.ohio.gov with the project number included in the subject line (no phone calls please). Southern State Community College (SSCC), intends to engage a Design-Builder (DB) to provide design and construction services for: Basic Renovations - HVAC, located on campus at Southern State Community College, Hillsboro, OH 45133. The project criteria provide specific information for the scope including drawings. Given the minimal design work required for this project, most of the DB work will be performed by a mechanical contractor. Important elements in the selection process will be experience in ensuring protection of building interiors and surrounding campus property. The firms must have experience in the complete design and monitoring of the work to be performed, to ensure the work meets all codes and requirements, and to ensure subsequent warranties. The Program of Requirements ("POR") and Criteria Design for the Project have been developed by the Criteria Architect/Engineer ("Criteria A/E"), These Criteria A/E services were acquired by the Contracting Authority under a separate contract. Parties interested in reviewing the Criteria information are welcome to contact Brad Curtis to request an electronic copy at Brad.Curtis@ofcc.ohio.gov. All regulatory and environmental regulations and/or permitting will be the responsibility of the DB selected for this project. SSCC's HVAC system is original to the building's 1980's construction. The system uses above-ceiling water source heat pumps, a main cooling tower located inside a building section with an open roof, and two boilers. Additionally, a domestic water heater will be replaced as part of this scope. All existing condenser water, heating water, and domestic circulating pumps, valves, and trim will be replaced with the equipment. The original controls (AET Systems) are still functional throughout portions of the building with most units wired to a local thermostat. In addition to the criteria documents, specific information about the project includes: 1. The existing cooling tower has temporarily been repaired to sustain the current cooling season only. To address manufacturing lead times, a new cooling tower has been sourced by the owner through a separate bidding process. The selected DB will be required to remove the existing tower and install the new tower with a startup no later than March 1 st , 2025. The tower is enclosed in a roofless portion of the building surrounded by four walls adjacent to the mechanical room. The existing tower will require a crane lift for removal. The new cooling tower will need to be elevated above pit bottom to ensure proper airflow for optimum performance, as coordinated with manufacturer. A supporting structure will need to be constructed to elevate the new tower to proper height based on manufacture's recommended height and clearances. 2. The abandoned second cooling tower and pumps located away from the building next to a parking lot will be removed with piping and electricity capped off. 3. Several WSHP's have been replaced in the last 36 months and are not included in the project scope for replacement. However, these units will still need to be considered as part of the overall system for BAS controls. 4. Equipment will need to be integrated with an existing Tridium BAS. The DB will be required to work with the owner's Master Systems Integrator (MSI) for controls. 5. Existing underground condenser water storage tank will be abandoned and isolated with a cap and bypass valve. 6. Some areas of the building will remain occupied, and systems will need to remain in operation as much as possible during construction. Where possible, new WSHP will be installed in open ceiling space adjacent to existing units still in operation, to minimize the down time of each piece of equipment during switchover. DB contractor shall work with the College to develop a schedule for each location that corresponds with the planned occupancy of each space. 7. WSHP branches will require the installation of new isolation valves. The system shall be drained temporarily at the start of construction with condenser water stored for refilling. After valve installations are complete for all units, the system will be immediately refilled to ensure the system can remain in operation while heat pumps are replaced throughout the project. The selected Design-Builder ("DB"), as a portion of its required Scope of Services and prior to submitting its proposal, will discuss and clarify with the Contracting Authority and/or Owner, the breakdown of the Agreement detailed cost components, to address the Owner's project requirements and refine the project schedule. As required by the Agreement, and as properly authorized, provide the following categories of services: develop and maintain estimates of probable construction cost, value engineering, project schedules, and construction schedules; lead and manage the Schematic Design, Design Development, Subcontractor Prequalification and Bidding process, Construction Documents, Construction and Closeout stages. Total Project Cost $1,500,000 State Funding $1,500,000 Construction Cost $1,200,000 Other Funding $0 DB Preconstruction Services Start 11-28-24 Construction Stage Notice to Proceed 03-31-25 Substantial Completion of all Work 11-26-25 DB Services Completed 12-26-25
Post-Bid
Educational
$1,500,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 9, 2024
March 31, 2025
100 Hobart Dr, Hillsboro, OH
Related To This Project
Hillsboro, OH
Bid Date: Oct 31 2024
Hillsboro, OH
Bid Date: Oct 10 2024
Hillsboro, OH
Bid Date: Nov 13 2024
Hillsboro, OH
Bid Date: Dec 03 2024
Hillsboro, OH
--
Hillsboro, OH
--
Hillsboro, OH
Bid Date: Sep 17 2024
Hillsboro, OH
--
Hillsboro, OH
Bid Date: Sep 18 2024
Hillsboro, OH
Bid Date: Jul 31 2024
Hillsboro, OH
Bid Date: Aug 13 2024
Hillsboro, OH
Bid Date: Aug 14 2024
Hillsboro, OH
Bid Date: Aug 21 2024
Hillsboro, OH
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.