BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Cooper Township, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Description and Location of the Project is as Follows: for the Improvement of Certain Sections of State Highway in Clearfield County, Cooper & Covington Townships, Commonwealth of Pennsylvania, State Route 1011 Section A05. The Project Being Situated as Follows: on State Route 1011 From Segment 0120/offset 3172 to Segment 0130/offset 0571. For Preservation Type Work to One Structure With the Work Including the Removal of Portion of Existing Bridge, Fabricated Structural Steel Repairs, and Zone Painting Existing Structural Steel for a Total Construction Length of Approximately 521 Feet (0.10 Mile) as Indicated on the Approved Drawings Included in the Bid Package. Project Cost Range: $0.00 - $99,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 80.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Rolling Stone Rd over WB Susq Rvr/RJC RR

Award

Bridges / Tunnels

$140,720.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

9

7

2

7

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
29
Bidding Soon
424
All Active Projects
175
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

November 25, 2024

img_map_placeholder

State Rte 1011, Cooper Township, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.