BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in San Bernardino, California. Working plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

***As of October 24, 2024. Project is placed on hold due to budget constraints Cold plane and overlay, pavement reconstruction, bioswales, drainage, channel excavation, grading, channel paving, retaining walls, fencing, striping. The PVDBWCP improvements project has been designed by the County to alleviate impacts from historical flooding on surrounding properties. The Proposed Project is referred to as the PVDBWCP. The Proposed Project is located in the unincorporated community of Big Bear City, south of the Big Bear City Airport (see Figure 1 - Regional Location). The improvements will include pavement rehabilitation along Pine View Drive to Sugarloaf Boulevard and a bioswale for the Blue Water Channel at West Fairway Boulevard/Big Bear City Airport (see Figure 2 - Proposed Footprint). The Proposed Project will increase the hydraulic capacity of the Blue Water channel on the south side of Big Bear City Airport from Division Drive to Valley Boulevard. The channel bottom will be widened, and side slopes will be concreted. The channel bottom will vary from earthen to concrete as appropriate and also be amended to serve as a water quality bioswale. Additionally, the 90 degree turn where the drainage meets the Big Bear City Airport will be widened and constructed with a reduced angle to allow for proper drainage. Pavement rehabilitation will occur on Pine View Drive to Sugarloaf Boulevard, and the portion of Pine View Drive from Aeroplane Boulevard to Country Club Boulevard will be paved (previously paved but deteriorated down to dirt/gravel). Grading for the Proposed Project would involve approximately 13,000 cubic yards (CY) of cut, on-site fill of approximately 930 CY, and an import of aggregate base materials of approximately 360 CY. Final material staging areas would be determined by the Contractor and cleared by the County, however, the following areas would likely be impacted: (see Figures 3a, 3b, and 3c - Environmental Impact Map): o Fairway Boulevard between Pine View Drive and Kiener Drive o The airport / south plane parking stalls o County parcels that extend the north-south roads to the south of Fairway Boulevard The construction schedule is estimated to be approximately 8 months and is anticipated to occur during August to March. Project Location The Proposed Project is located within Sections 14 and 15, Township 2N, Range 1E, San Bernardino Baseline and Meridian (SBB&M) shown on the Big Bear USGS 7.5" Quadrangle. Latitude/Longitude ranges from 3415'45.66"N; 11651'56.69"W to 3415'45.66"N; 11651'16.66"W along the airport and from 3415'45.62"N; 11651'33.36"W to 3415'25.22"N; 11651'29.25"W along Pine View Drive.

Final Planning

Roads / Highways

$800,000.00

Public - County

Paving, Site Work

39

10

49

2

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
93
Bidding Soon
2,186
All Active Projects
1,004
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

April 4, 2025

img_map_placeholder

Multiple Locations, San Bernardino, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.