BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in San Bernardino, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The work to be done consists, in general, of fabricate and place construction information signs, clearing and grubbing; removal and construction of various concrete improvements, including curb ramps, sidewalk, driveway approaches, curb, curb and gutter, cross gutter, spandrels; roadway mill; remove and replace deteriorated asphalt concrete pavement; crack seal, asphalt concrete overlay; application of traffic striping and pavement markings; adjustment of existing utility frames and covers and City water utility enclosures; grinding curb and gutter, sidewalk and driveway approaches; NPDES and SWPPP requirements; traffic control; survey marking and such other items or details, not mentioned above, that are required by the Plans, Standard Specifications, or these Special Provisions. Q&A Deadline 09/10/2024 3:00 PM (PDT) Project Type RFQ (Request for Quote) Response Types Line Items Cost File Response File Type of Award Lump Sum Unless otherwise provided in the Instructions for Bidders, each Bidder shall be a licensed contractor pursuant to sections 7000 et seq. of the Business and Professions Code in the following classification(s) throughout the time it submits its Bid and for the duration of the Contract: Class A or appropriate License. Each Bid shall be accompanied by cash, a certified or cashiers check, or Bid Bond secured from a surety company satisfactory to the City, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. LIQUIDATED DAMAGES it is agreed that the Contractor will pay the City the sum of $1,500 for each and every calendar day of delay beyond the time prescribed in the Contract Documents for finishing the Work, City reserves the right to reject any or all Bids or to waive any irregularities or informalities in any Bids or in the bidding process.

Post-Bid

Sidewalks / Parking Lot

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
93
Bidding Soon
2,186
All Active Projects
1,047
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2024

November 7, 2024

img_map_placeholder

Multiple Locations, San Bernardino, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.