Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 1, 2024 at 8:00 PM
Updated October 2, 2024
Site work and paving for a civil project in Attalla, Alabama. Completed plans call for site work for a road / highway; for paving for a road / highway; and bridge / tunnel.
County : Etowah Call # 014 Contract Time: 180 Working Days for constructing the Micro-Milling, Resurfacing, Bridge Guardrail Retrofit, Guardrail Installation, and Traffic Stripe to include Concrete Replacement on I-59 from the St. Clair County Line to 1.000 mile north of the SR-1 (US-431/US-278) Interchange in Attala. Length 8.478 mi. The Bracket Estimate on this project is from $7,261,583 to $8,875,268 . If further clarification is needed, please contact the Plans and Proposals Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 014 - Micro-Milling, Resurfacing, Bridge Guardrail Retrofit, Guardrail Installation, and Traffic Stripe to include Concrete Replacement on I-59 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Roads / Highways
$7,944,072.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 27, 2024
November 26, 2024
I-59, Attalla, AL
Related To This Project
Attalla, AL
Bid Date: Oct 04 2024
Attalla, AL
Bid Date: Feb 13 2025
Attalla, AL
Bid Date: May 16 2025
Attalla, AL
Bid Date: May 16 2025
Attalla, AL
Bid Date: May 16 2025
Attalla, AL
Bid Date: May 30 2025
Attalla, AL
Bid Date: May 29 2025
Attalla, AL
Bid Date: Jun 24 2025
Attalla, AL
Bid Date: Aug 15 2024
Attalla, AL
Bid Date: Aug 08 2024
Attalla, AL
Bid Date: May 01 2024
Attalla, AL
Bid Date: May 01 2024
Attalla, AL
Bid Date: Feb 27 2024
Attalla, AL
Bid Date: Feb 27 2024
Attalla, AL
Bid Date: Feb 06 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
