EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 27, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in New Britain, Connecticut. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The scope of work generally consists of Complete Street Improvements on John Downey Drive between South Street and Newington Avenue (SR 174). The work includes installation of new granite curbing, new bituminous concrete multi-use trail, new concrete sidewalks and pedestrian ramps to meet current ADA standards, new concrete driveway aprons, replacement of existing catch basin tops and installation of new catch basins, milling and paving, installation of new signage and pavements markings, installation of new street trees, replacement of the traffic control signal at the John Downey Drive and South Street intersection, minor traffic signal modifications at the John Downey Drive and Newington Avenue (SR 174) intersection. The City reserves the right to accept or reject any or all bids or any part of a bid presented, or to invite proposals as its interest may appear. Each bid must be accompanied by a bid bond or by a certified check of the bidder in the amount of TEN percent (10%) of the total bid amount, payable to the City of New Britain. The bidder awarded the Contract shall, at the time of signing the Contract, submit an executed Performance Bond and Labor & Material Payment Bond in the amount of 100% of the Contract amount in accordance with C.G.S. 49-41 and Instruction to Bidders No. 17. Attention is called to the fact that this is a prevailing wage project and not less than the minimum salaries and wages as set forth in the Bid Documents must be paid on this project. The Contractor must adhere to all relevant provisions of Section 46a-95 of the Connecticut General Statutes, and any other relevant laws and regulations regarding Affirmative Action.' An "affidavit" of non-collusion shall be included in the Bid Documents and must be completed by the prospective bidder and returned with the bid. Failure to return an executed non-collusion affidavit with a proposal may result in the subsequent rejection of subject bid. The Contractor shall comply with the Copeland Anti-Kickback Act and Regulations of the Secretary of Labor (29 CFR, Part 3). State law requires a minimum of twenty-five (25%) percent of the state-funded portion of the contract for award to subcontractors holding current certification from the Connecticut Department of Administrative Services ("DAS") under the provisions of CONN. GEN. STAT. 4a-60g. (25% of the work with DAS certified Small and Minority owned businesses and 25% of that work with DAS certified Minority, Women and/or Disabled owned businesses.) The contractor must demonstrate good faith effort to meet the 25% set-aside goals.

Bid Results

Roads / Highways

$590,386.00

Public - City

Paving, Site Work

87

7

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Steep Slope Roofing, Shingles and Shakes, Wood Shingles
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Paving Specialties, Pavement Markings, Painted Pavement Markings, Planting, Turf and Grasses, Plugging, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Mobile Plant Equipment, Mobile Earth Moving Equipment, Graders, Trucks, Dump Trucks

Find More Local Projects

Within 75 Miles of This Project
626
Active Projects
376
Bidding Soon
5,239
All Active Projects
2,291
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2024

October 24, 2024

img_map_placeholder

John Downey Dr, New Britain, CT

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

John Downey Drive Corridor Improvements project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.