BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work, paving and outdoor lighting for a mixed-use development in Freeport, Texas. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Estimate: $24,233,681.00. Removal and Disposal of Existing Asphalt Paving - approximately 3,733 Square Yards Removal and Disposal of Existing Drainage Pipe, ranging in size from 24" diameter to 3' X 2' - approximately 329 Linear Feet Removal and Disposal of Existing Chain Link Fence - approximately 465 Linear Feet New Chain Link Fence (not including gates) - approximately 446 Linear Feet Electrical work for High Mast Pole lighting - bid as Lump Sum New 8" Waterline and fire hydrant assemblies to match high mast pole grid - approximately 1258 Linear Feet Reinforced Concrete Storm Sewer, ranging in size from 24" to 72" - approximately 3,467 Linear Feet Reinforced Concrete Storm Sewer, 6' X 6' - approximately 66 Linear Feet Storm Sewer Junction Boxes with inlet tops - bid as Lump Sum Storm Sewer Curb Inlets - approximately 9 Each Concrete Storm Outfalls - bid as Lump Sum. Excavation and Hauling of on-site spoils - approximately 13,040 Cubic Yards (Location inside the Port) Compacted Select Fill for Site Grading - approximately 12,180 Cubic Yards Relocation of Flexible Base - approximately 36,620 Cubic Yards (Port Furnished) 15" Concrete Pavement - approximately 81,650 Square Yards 8" Concrete Pavement - approximately 124 Square Yards 6" Concrete Pavement - approximately 29 Square Yards Fire Hydrant Assemblies - approximately 7 Each 12" Steel Bollards around Fire Hydrants and High Mast Light Poles - approximately 73 Each. The Work shall generally consist of clearing & grubbing, excavation to proposed grade, fill to proposed grade, placement of new concrete pavement, water and drainage utilities, drainage outfall, and electrical high mast pole lighting. Direct questions regarding distribution of Bid Documents to the Design for this Project to: Michael J. (Mick) Helfrich, Jr, PE, Project Manager LJA Engineering, Inc. 713-953-5102. The Owner reserves the right to reject any or all bids or to accept any bids deemed advantageous. There are no SBE goals established for this project.

Bid Results

Transportation Terminals

$18,508,603.00

Public - City

Outdoor Lighting, Paving, Site Work

47

13

13

7

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
51
Bidding Soon
2,154
All Active Projects
793
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2024

December 4, 2024

img_map_placeholder

Multiple Locations, Freeport, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.