BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Harker Heights, Texas. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.

As of October 31, 2024 this project was awarded to JH Contracting LLC in the amount of $268,336.97 https://kdhnews.com/news/local/harker-heights-council-to-discuss-and-possibly-vote-on-several-capital-improvement-projects/article_9254ff00-8ff2-11ef-9b6e-d38563c84ae3.html Harker Heights council to discuss and possibly vote on several capital improvement projects The Harker Heights City Council will discuss and possibly vote Tuesday on $268,336 for several capital improvement projects. These projects include the Roy Reynolds Bridge scour protection, drainage flume replacement from Mountain Lion Road to Pontiac Drive and channel scour protection downstream of Clore Road. Scour protection means removal of sediment such as sand or gravel. According to the staff report, these projects were combined into one bid because of their similarities. The city engineer’s estimate of the probable cost for this project was $704,955. However, JH Contracting had by far the lowest bid at $268,336. The funds for this project will be paid out of the Capital Improvement Fund and the competition of the project is expected in 180 days. The Harker Heights City Council will also be appointing members to several boards, committees and commissions, including the Harker Heights Planning and Zoning Commission. The City Council will meet in closed session to discuss the appointment of officers to the Planning and Zoning Commission and the Board of Adjustments. Killeen ISD Superintendent Jo Ann Fey will also give a presentation to the City Council about the state of the school district, including updates on enrollment, projected growth, academic activities and facilities. The meeting will take place at the Harker Heights Library, 400 Indian trail, at 5 p.m. ----------------------------------- Roy Reynold Bridge Scour Protection, Drainage Flume Replacement (Mountain Lion Rd. to Pontiac Dr.), and Channel Scour Protection Downstream of Clore Rd The deadline to ask questions is 9/26/2024 5:00 PM CST Estimate: $680,000 A. Work of the Project includes channel shaping the existing earthen channel and installation of reinforced concrete channel lining. Also included are grouted rock rip rap transition sections both upstream and downstream. B. Construct the Work in accordance with the Bid Items listed on the Bid Form and as generally described below: 1. Mobilization/Demobilization. 2. Shaping of the existing earthen channel. 3. SWPPP & Implementation. 4. NOI. 5. Installation of reinforced concrete channel lining 6. Installation of grouted rock rip rap transition sections both upstream and downstream. 7. Grading and vegetating all disturbed areas. 8. All other Work. a. Install all other project Work as presented in the Project Manual and as shown in the Drawings, including but not limited to site improvements, grading and drainage, complete and in place. Sealed bids marked Roy Reynolds Bridge Scour Protection, Drainage Flume Replacement (Mountain Lion Road to Pontiac Drive), and Channel Scour Protection Downstream of Clore Road - BID # 24-560-007-01 are to be submitted to: City of Harker Heights Attn: Kelsey Coffman 305 Miller's Crossing Harker Heights, Texas 76548

Award

Bridges / Tunnels

$268,337.00

Public - City

Paving, Site Work

31

21

5

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
25
Bidding Soon
1,545
All Active Projects
580
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

October 31, 2024

img_map_placeholder

Multiple Locations, Harker Heights, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.