BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 22, 2025 at 8:00 PM

Updated June 4, 2025

Site work for a civil project in Harker Heights, Texas. Completed plans call for site work for a road / highway.

https://kdhnews.com/harker_heights_herald/local/heights-council-votes-to-move-ahead-on-capital-improvement-items/article_d7ed7f0a-c8fc-4926-90a6-0a46f40e267c.html Heights council votes to move ahead on capital improvement items The Harker Heights City Council on Tuesday unanimously approved several items that will facilitate capital improvement projects in the city. The biggest item was the approval of an advance funding agreement with the Texas Department of Transportation for Phase 3 of the Warriors Path construction project. Under the agreement, Harker Heights will access $4.4 million in funding allocated by the Killeen Temple Metropolitan Planning Organization, for the construction of about a half mile of Warriors Path between Old Nolanville Road and Pima Trail. The city must pay a 20% matching amount of $1.1 million. City Engineer Kristina Ramirez noted that a traffic signal accounts for about a half-million dollars of the cost, plus drainage construction is a sizable amount. The city almost must pay TxDOT $109,000 so the agency can process the grant. Ramirez said that engineering and an environmental report must be completed before TxDOT gives its final OK. “We’re looking at a bid date of calendar 2028,” Ramirez said, noting that it would be “close to 2030” when the road construction is complete. In other action Tuesday, the council approved a resolution authorizing an advance agreement with TxDOT for sidewalks along a 0.3-mile segment of Indian Trail near the I-14 overpass. The project will use $968,000 in KTMPO funds, along with a city match of $242,000 for the project, which is scheduled to be let for bids in August 2027. Ramirez noted that an environmental study for a recent nearby project came back clean, so it is anticipated that the sidewalk project won’t encounter any obstacles. Also Tuesday, the council awarded a $291,727 contract for the city’s 2024 Manhole Rehabilitation Project to B-Corp Utilities Inc. of Gatesville, the project’s low bidder. Just two bids were received by the city, and B-Corp’s bid was below projects for the project’s cost. The project will involve replacing 11 manholes in northern Harker Heights starting along Pecan Drive and extending southward to just south of Clore Road. The project also will include replacement of the existing Air Release Valve Assembly. Also Tuesday, the council voted unanimously to adopt the 2025 Bell County Mitigation Action Plan update. The plan, which encompasses 815 pages, addresses responses to manmade emergencies such as floods and tornadoes, as well as other emergencies such as cyberattacks. Harker Heights is the first entity to adopt the plan update, Ramirez noted. Prior to the council’s action on regular business, Mayor Michael Blomquist read five proclamations, one each recognizing Lemonade Day, Water Safety Month, Building Safety Month, Older Americans Month and Professional City Clerks Week. Blomquist also presented the Mayor’s Outstanding Achievement Award to 17 local youth who excelled in various areas. Two of the youth were recognized as National Merit Scholarship finalists. Others recognized were honored for making the Texas Music Educators’ All-State Choir or All-State Orchestra. Other students recognized were senior members of Harker Heights High School’s Knights of the Round Table. -------------------------------------------------------------------------------- Scope Mobilization & Bonds Storm Water Pollution Prevention Plan and Implementation Traffic Safety Plan and Implementation Revegetation of Disturbed Areas Cleaning and coating exiting Manholes Remove and Replace collar and ring on existing Manholes Providing Bypass Pumping System during the rehabilitation to prevent inflow. All questions and inquiries about the project should be directed to Thomas D. Valle, P.E., until 12:00 p.m. on Monday, December 13, 2024. Questions after that time and date will not be addressed and the Engineer and/or Owner shall not be bound by any references or dates obtained by the Bidders unless an official addendum is produced and released by Kasberg, Patrick & Associates, LP. For more information, please contact Ellis Smith at (254) 773-3731 or esmith@kpaengineers.com. The Contractor shall have 150 consecutive CALENDAR DAYS to complete the proposed Work. Bid Form provided and must be accompanied by a cashiers check, certified check or acceptable Bidders bond payable without recourse to the City of Harker Heights, Texas in an amount not less than five (5) percent of the Bid submitted as a guarantee that the Bidder will enter into a Contract and execute a Performance Bond, Payment Bond and a Maintenance Bond within thirty (30) Days after the notification of the award of the Contract. In addition the Owner reserves the right, as the interest of the Owner may require and to the extent permitted by law, to grant preference to local Bidders, to reject any or all Bids, and to waive technical defects in the Bids. The right is reserved to reject any or all Bids and to waive technical defects, as the interest of the Owner may require. estimate Base Bid: $185,160.00; Add Alternate "A": $83,535.00; Add Alternate "B": $78,530.00 The deadline to ask questions is 3/28/2025 12:00 PM CST

Bid Results

Water / Sewer

$207,548.00

Public - City

Site Work

19

11

8

5

Subscribe For Documents

111 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
98
Bidding Soon
1,785
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

May 8, 2025

Project location map

Multiple Locations, Harker Heights, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.