Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Harker Heights, Texas. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.
As of October 31, 2024 this project was awarded to JH Contracting LLC in the amount of $268,336.97 https://kdhnews.com/news/local/harker-heights-council-to-discuss-and-possibly-vote-on-several-capital-improvement-projects/article_9254ff00-8ff2-11ef-9b6e-d38563c84ae3.html Harker Heights council to discuss and possibly vote on several capital improvement projects The Harker Heights City Council will discuss and possibly vote Tuesday on $268,336 for several capital improvement projects. These projects include the Roy Reynolds Bridge scour protection, drainage flume replacement from Mountain Lion Road to Pontiac Drive and channel scour protection downstream of Clore Road. Scour protection means removal of sediment such as sand or gravel. According to the staff report, these projects were combined into one bid because of their similarities. The city engineer’s estimate of the probable cost for this project was $704,955. However, JH Contracting had by far the lowest bid at $268,336. The funds for this project will be paid out of the Capital Improvement Fund and the competition of the project is expected in 180 days. The Harker Heights City Council will also be appointing members to several boards, committees and commissions, including the Harker Heights Planning and Zoning Commission. The City Council will meet in closed session to discuss the appointment of officers to the Planning and Zoning Commission and the Board of Adjustments. Killeen ISD Superintendent Jo Ann Fey will also give a presentation to the City Council about the state of the school district, including updates on enrollment, projected growth, academic activities and facilities. The meeting will take place at the Harker Heights Library, 400 Indian trail, at 5 p.m. ----------------------------------- Roy Reynold Bridge Scour Protection, Drainage Flume Replacement (Mountain Lion Rd. to Pontiac Dr.), and Channel Scour Protection Downstream of Clore Rd The deadline to ask questions is 9/26/2024 5:00 PM CST Estimate: $680,000 A. Work of the Project includes channel shaping the existing earthen channel and installation of reinforced concrete channel lining. Also included are grouted rock rip rap transition sections both upstream and downstream. B. Construct the Work in accordance with the Bid Items listed on the Bid Form and as generally described below: 1. Mobilization/Demobilization. 2. Shaping of the existing earthen channel. 3. SWPPP & Implementation. 4. NOI. 5. Installation of reinforced concrete channel lining 6. Installation of grouted rock rip rap transition sections both upstream and downstream. 7. Grading and vegetating all disturbed areas. 8. All other Work. a. Install all other project Work as presented in the Project Manual and as shown in the Drawings, including but not limited to site improvements, grading and drainage, complete and in place. Sealed bids marked Roy Reynolds Bridge Scour Protection, Drainage Flume Replacement (Mountain Lion Road to Pontiac Drive), and Channel Scour Protection Downstream of Clore Road - BID # 24-560-007-01 are to be submitted to: City of Harker Heights Attn: Kelsey Coffman 305 Miller's Crossing Harker Heights, Texas 76548
Award
Bridges / Tunnels
$268,337.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 1, 2024
October 31, 2024
Multiple Locations, Harker Heights, TX
Related To This Project
Harker Heights, TX
Bid Date: Oct 08 2024
Harker Heights, TX
--
Harker Heights, TX
Bid Date: Dec 05 2024
Harker Heights, TX
Bid Date: Dec 10 2024
Harker Heights, TX
Bid Date: Dec 18 2024
Harker Heights, TX
--
Harker Heights, TX
Bid Date: Oct 08 2024
Harker Heights, TX
--
Harker Heights, TX
--
Harker Heights, TX
--
Harker Heights, TX
--
Harker Heights, TX
--
Harker Heights, TX
Bid Date: Aug 01 2024
Harker Heights, TX
Bid Date: Jul 23 2019
Harker Heights, TX
Bid Date: Aug 28 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.