BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Holyoke, Massachusetts. Completed plans call for the renovation of a residential development.

Flooring and Subfloor removal and replacement in 25 Leary Ave. Furnish all labor, materials, tools, and equipment to demo flooring and subfloor in 25 Leary Ave. Subfloor replacement throughout unit as well as install prefinished hardwood flooring, install new stair treads and new painted wood base installed throughout units first and second floors. The contractor is responsible for all associated permit fees. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. All questions pertaining this QSP shall be addressed to Eric Jimmo, Modernization Coordinator, in writing by email, ejimmo@holyokehousing.org and Amie Chrzanowski, Purchasing Assistant, achrzanowski@holyokehousing.org Questions due by September 13 , 2024 by 1:00 pm The Work of the Contract consists of: - Removal and disposal of 700 Sqft of hardwood flooring and subfloor down to bare floor joist in 3 2nd floor bedrooms and 2nd floor hallway landing, also included in the scope for subfloor removal is the 1st floor living room. - Removal and disposal of 150 Sqft of sheet good flooring and existing underlayment in kitchen and bathroom. - Furnish and install new 3/4 '' Tongue and groove subfloor sheathing. Subfloor installation requires the use of approved sub floor adhesive. - Furnish and install new 1/4 '' underlayment in 3 bedrooms, hallway landing, living room, kitchen & bathroom - Furnish and install sufficient quantity of pre-finished 3/4 ''X 2 1/4 '' clear maple or oak random Length plank to be directly fastened to new subfloor to finish all areas of the unit scheduled for new hardwood flooring. 3 bedrooms , hallway landing, living room. - Furnish and install sufficient Quantity of Sheet Vinyl Flooring to kitchen and bathroom of the unit. Sheet vinyl Flooring to be IVC Floors-FLEXITEC- Previa 544 or Equal. - HHA will remove all items required to be moved prior to work starting. - Furnish and install new wood baseboard throughout entire unit. Base board to be paint grade 1x4 pine . New baseboard to receive 1 coat primer and 2 coats finish paint. Paint to be supplied by HHA. Adjust and cut down all doors to facilitate a 3/4 '' gap at bottom of door. B. Execution of Work: Work to be performed in timely and workmanlike fashion throughout the project. Site must be cleaned up daily with access needed for overnight

Post-Bid

Residential Subdivision

$45,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
576
Active Projects
337
Bidding Soon
4,593
All Active Projects
1,905
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 20, 2024

October 21, 2024

December 20, 2024

img_map_placeholder

25 Leary Dr, Holyoke, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.