Demolition and site work for a water / sewer project in Key Biscayne, Florida. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

The project consists of furnishing all materials (except those listed in Section 4.00 "Materials and Equipment Furnished by The Department"), labor, equipment, tools and other facilities and services necessary for proper execution, testing, and completion of the work required to Upgrade Sewage Pump Station No. 0132. This includes, but is not limited to, site preparation, demolition work, installation of new structures, installation of mechanical and electrical equipment, and restoration of impacted areas. Site preparation may require clearing and grubbing prior to demolition and construction work. The Contractor shall provide uninterrupted by-pass pumping capabilities for the existing pump station flow during all construction time and until the new pump station is completely operational, the bypass system shall have a flow and head capacity equal to or greater than the proposed pumps; tested and accepted by the Owner and regulatory agencies (see by-pass requirements on Section 8.00 "Measurement and Payment"). ESTIMATED COST: $1,617,870.00 SBE- Goods & Service: 1% NIGP Codes: (NIGP 98852) Landscaping, (NIGP 79050) Sodding LICENSE REQUIREMENT: General Building Contractor; Building Contractor; Pipelines Engineering Contractor; Underground Utility / Excavation The original Bid Security (in the form of a bid bond or cashier's check) MUST be delivered to WASD, at the address above, BEFORE the bids are opened. Failure to deliver the original will result in the bid submission being rejected as non-responsive.

Post-Bid

Water / Sewer

$1,617,870.00

Public - County

Demolition, Site Work

24

21

8

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, Mobile Earth Moving Equipment, Excavators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
53
Bidding Soon
1,108
All Active Projects
488
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 26, 2024

December 26, 2024

img_map_placeholder

95 Harbor Dr, Key Biscayne, FL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Upgrade Sewage Pump Station No. 0132

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.