BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Tucson, Arizona. Completed plans call for site work for a water / sewer project.

Waterline Improvement at Multiple Campuses. 3.1 Marana Unified School District is requesting Statements of Qualifications (SOQs) for the Qualified Selected Bidders List - Waterline Improvement at Multiple Campuses in accordance with A.A.C. R7-2- 1101. The district intends to utilize this procurement method based on a two-phase process. 3.2 The budget estimate is approximately $2 Million, which is contingent upon the availability of Arizona Department of Administration - School Facilities Division funding. EMC Group Architects is the architectural firm managing the project. There are two (2) Building Renewal Grants involving Marana Middle School, Estes Elementary and MCAT High School. 3.3 The project involves providing new waterlines connecting to municipal water for domestic water, and utilizing existing waterlines from well water source for fire loop for site hydrants and building connections. Patch and repair paving, landscaping, site furnishings, etc. as required to perform the work. 3.4 Contractor is responsible for any permits required (i.e. right-of-way use permits, etc.). Contractor is responsible for locating all existing utilities (exact locations, elevations, and extent of all utility facilities within the project that may be affected by the work). 3.5 Logistics planning is necessary to secure construction areas and areas that will require maintained campus access (during summer school). 3.6 Marana Middle School has some (minimal) summer school activities to be coordinated around (maintaining access to Admin Office (Bldg B), Old Gym (Bldg F) and along East side of Class Buildings D, E, J and L during school hours). 3.7 MCAT High School has summer school activities to be coordinated around (maintain access to Buildings 1001, 1002,1003 and 1008). 3.8 Construction is anticipated upon funding approval and projected schedule is Summer 2025. The school year begins August 4, 2025 with staff anticipated back onsite a week prior. A school calendar will be provided in the Invitation for Bids for Phase Two. 3.9 Construction scheduling shall assume pre-construction meeting(s), a punch list, Owner-ArchitectContractor (OAC) and site review meetings, plus a site review and punch walk by the architect.

GC Bidding

Water / Sewer

$2,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
12
Bidding Soon
549
All Active Projects
203
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Winning Bids!

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 25, 2024

October 25, 2024

img_map_placeholder

Multiple Locations, Tucson, AZ


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.