EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 2, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Coalgate, Oklahoma. Completed plans call for the renovation of a educational facility.

Work Will Also Include Selective Demolition And Preparation For Concrete Sidewalk, Sodding, Concrete Floor Leveling, Metal Stud And Wood Stud Framed Walls, Eifs System, Gypsum Board, Gypsum Ceilings, Hollow Metal Doors And Frames, Pre-hung Wood Doors, Door Hardware, Aluminum Window Replacement, New Finishes Throughout, Ceramic Tile, Carpet, Luxury Vinyl Tile, Sealed Concrete, Painting, Fi Re Alarm, Hvac Replacement, Plumbing, Electrical And Lighting Systems Rework, Complete And Ready For Use. C. Location: Coalgate Public Schools 300 Frey Street, Coalgate, Ok 74538 1.6 Bid Date, Time And Place A. Bid Date, Time And Place Will Be Issued In An Addendum At A Later Date. 1.7 To: Potential Bidders. B. Bidders For Work Packages May Be Required To Submit A Contractor's Qualifi Cation Statement As Specifi Ed In Document 00 4513 - Bidder's Qualifi Cations. Bidders For Work Packages Should Be Prepared To Submit Contractor's Qualifi Cation Statement To Construction Manager. Utilize Aia Form A305 - Contractor's Qualifi Cation Statement. C. Bid Documents For Stipulated Sum Separate Prime Contracts For Specified Work Packages May Be Obtained From The Office Of The Construction Manager. Contact The Office Of The Construction Manager To Reserve Bidding Documents. Bidders May Obtain Maximum Two (2) Sets Of Bidding Documents. 1. Bidders Are Responsible For Arranging Pick-up Or Shipment Of Bidding Documents With The Construction Manager. Shipping Cost Determined By Construction Manager. E. Bidders May View The Bid Documents At The Office Of The Owner Or At Local Plan Rooms. F. Bidders Will Be Required To Provide Bid Security In The Form Of A Bid Bond In The Amount Of Fi Ve (5) Percent Of The Bid Amount. 1. Bidders Are Required To Submit Sample Copies Of Each Required Bond, Including Bid Bond, No Less Than Seven (7) Days Prior To Scheduled Bid Opening. G. Submit Your Offer On The Bid Form Provided In The Project Manual. H. Your Bid Is Required To Be Submitted Under A Condition Of Irrevocability For A Period Of 30 Days After Submission. I. The Owner Reserves The Right To Accept Or Reject Any Or All Offers. 1.8 Reproduction Vendor

Post-Bid

Educational

$1,200,000.00

Public - City

Renovation

23

28

9

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Substitution Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Installer Qualifications, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing, Cast Decks and Underlayment, Grouting
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Gypsum Sheathing, Finish Carpentry, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Other Specialties, Pest Control Devices
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Furniture, Seating, Chairs, Residential Furniture, Beds
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Ventilation Hoods, Fume Hoods, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Earthwork Methods, Soil Treatment, Rodent Control, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
34
Bidding Soon
351
All Active Projects
161
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2024

December 6, 2024

img_map_placeholder

300 Frey St, Coalgate, OK


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Coalgate Public Schools - Band Room Renovation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.