BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Edmonton, Alberta. Contact the soliciting agency for additional information.

Description/Summary Alberta Agriculture and Irrigation requires the services of an engineering consultant to perform an engineering review and assessment of the water infrastructure in the nine drainage districts of Alberta. The services to be provided shall include the following for each of the drainage districts: 1. Provide a historic overview of the district and its formation and confirm the legal boundaries and the total area of the district. 2. Develop detailed drainage layout plans showing all water ditches (with flow directions) and all existing surface water structures, including culverts, bridges, dikes, gates, staff gauges, etc. a. Review previous studies, construction records, technical reports, design drawings, as-built drawings, rehabilitation records, surveys, etc. It is important to note that most of these documents are in paper format with limited electronic versions available in AGI's Water Infrastructure and Operations branch office in Camrose. b. Conduct site visits to identify and confirm the structure locations and types, and to identify any discrepancy in location and type with existing records if available. Give consideration to private land access in the project areas during all phases of the project. The consultant should arrange for at least one site visit for each district, ensuring that all visits are completed within a total maximum of 10 days for all the districts. 3. Develop a naming system for the drains, ditches, and laterals in accordance with the existing names from records. If no names exist or if there are discrepancies between existing records, create a new naming system for the detailed drainage layout plans developed. 4. Lead pre-inspection (kick-off) sessions with the drainage district's board members, with input from AGI. The objectives of the kick-off sessions are: a. Ensure that the drainage district board members are aware of the study, its objectives, timeline, and private land access requirements if any. b. Seek inputs on sources of information for maintenance history, previous inspection or rehabilitation records, minor and major infrastructure issues, and plans for minor or major upgrades to the district's water structures and ditches. Include any additional information deemed necessary by the consultant. c. Collect anecdotal information on past drainage challenges and drainage bottlenecks. The consultant should arrange for no more than one session with each drainage district. Combined sessions of nearby districts are preferred to reduce costs. AGI can provide government facilities to host sessions in Camrose for Holden, Big Hay Lake, Hay Lakes, Daysland, and Bear Hills Lake districts, in Dickson for Cygnet and Dickson districts, and in Edmonton for Cameron and Manawan districts. 5. Perform an engineering review and condition assessment of the following: a. All surface water structures. This includes culverts, gates, dikes, protection works (if any), staff gauges, and field crossings of concerns identified during the pre-inspection sessions. b. All the major ditches within a 5 to 10-meter range upstream and downstream of structures, and all those of concern identified during the pre-inspection sessions. c. Lateral ditches of concern identified during the pre-inspection sessions. d. The district's outlet. Engineering review must identify any deficiencies that may prevent the structure from performing its original function. Additionally, it should assess the remaining service life of the structure and determine rehabilitation needs, upgrades, or maintenance requirements. 6. Recommend a set of actions for maintenance, rehabilitation, upgrade, replacement, or expansion to the existing water structures to restore them to their intended function, ensuring safe and efficient drainage. Prioritize the recommendations for each district. 7. Send a draft prioritized set of actions (i.e., maintenance, rehabilitation, upgrade, replacement, or expansion) to AGI for inputs from district's board members. After receiving follow-up from AGI, compare the follow-up set of actions to the recommended actions from scope item #6. 8. Provide a level "A" cost estimate and preliminary timeline for proposed set of actions. Cost estimate definitions are according to the Alberta Transportation and Economic Corridors "Engineering Consultant Guidelines for Highway, Bridge and Water Projects, Volume 1 - Planning, Preliminary Engineering, Design and Tender". 9. From the items in the scope above, create an inventory/database of all the water structures in the drainage district. The inventory/database shall include the following attributes: a. Structure name, type, geographic location, and year of construction (if available). b. Engineering review highlights. c. Expected remaining service lifetime. d. Blockage condition, if any. e. Record of maintenance and/or rehabilitation: type and reason of work performed, start date, completion date, cost of construction, source of funding, responsible consultant if any, etc. f. Any future planned maintenance, rehabilitation, or upgrade. g. Alberta Transportation File Number for the structure as applicable. h. Structure ownership and cost sharing information. i. District outlet type, location, and condition. j. Other information deemed necessary by the consultant. Complete engineering services are required, and any items not specifically mentioned required to satisfactorily complete the project shall be included in the Proposal. The output of this project will serve as the foundation for future subsequent phases of engineering services for the nine drainage districts. The consultant shall be responsible for any regulatory approvals required to complete the work. All assessments shall be in compliance with the regulatory requirements (i.e., Water Act, Water (Ministerial) Regulation (AR 205/1998 with amendments up to AR 253/2018) - Part 6, Alberta Dam and Canal Safety Directive (2018)), Drainage Districts Act and its supporting regulations, best engineering practices, and with other engineering and common industry standards for similar projects. If you have questions, please contact the Contact Person below only by email. Contact Person Mohamed Ammar Water Projects Management Engineer Method of Contact Mohamed.Ammar@gov.ab.ca Address Infrastructure Technical Services 8th Floor Oxbridge Place, 9820 - 106 Street Edmonton, Alberta Canada T5K 2J6 Questions must be submitted by email no later than - Sep 20, 2024 at 4:30 pm (MT) The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
30
Bidding Soon
529
All Active Projects
181
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 30, 2024

March 31, 2025

img_map_placeholder

Multiple Locations, Edmonton, AB

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.