BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Santa Cruz, California. Completed plans call for site work for a road / highway.

Description of Work: Jordan Gulch Sewer and Bank Stabilization project includes slope stabilization through the construction of a rock-slope protected earthen embankment to project a threatened sanitary sewer line, reconstruct road with new curb, removing trees and installing a permanent fence to protect a historic limekiln. Bidders may be required to submit qualifications with their bids as set forth in the Supplementary Instructions to Bidders. Question Deadline 10/01/2024 at 5:00 PM PT Requests for clarification or interpretation of the Bidding Documents shall be received and addressed only to: Nathan Weiner University of California, Santa Cruz Physical Planning, Development & Operations 1156 High Street, Barn G Santa Cruz, CA 95064 naweiner@ucsc.edu. The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: CSLB A Lic. - General Engineering Contractor Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. The work described in the contract is a public work subject to section 1771 of the California Labor Code. No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage ($15 per hour) and shall comply with all applicable federal, state and local working condition requirements. Estimated construction cost: $593,595.00.

Bid Results

Water / Sewer

$559,000.00

Public - State/Provincial

Site Work

10

15

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
38
Bidding Soon
1,253
All Active Projects
538
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2024

November 11, 2024

img_map_placeholder

Jordan St, Santa Cruz, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.