BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a playground / park / athletic field in Santa Cruz, California. Completed plans call for the renovation of a playground / park / athletic field.

For the following proposed project: Project Number 10637-010 Westside Research Park (WRP) Building C Buildout and Infrastructure. The Westside Research Park Building C Buildout and Infrastructure project at a University-owned property at 2300 Delaware Avenue, Santa Cruz, California is a proposed capital project to renovate unoccupied, and currently unusable space in building C (approximately 64,000 SF of interior space); remove legacy building infrastructure to facilitate the installation of new source equipment and distribution systems to meet N+1 goals and comply with long term campus decarbonization and electrification mandates. Improvements include 46,000 SF of exterior spaces on the 18.5-acre parcel. Acquired by UC Santa Cruz in 2004, the 2300 Delaware Avenue property is a level, 18-acre parcel with three large interconnected former industrial buildings constructed in 1980, and formerly used for manufacturing and administrative functions by a private company. Building C was previously a semiconductor fabrication plant with approximately 45,000 square feet of class 100 clean rooms in a bay and chase configuration. Building attributes include an interstitial fan deck above and a sub-fabrication basement below the former clean rooms. Most of the original building systems infrastructure exists and will need to be replaced to the current UCSC design standards, while maintaining the operations of existing research functions and supporting infrastructure. Current program objectives for the unoccupied Building C spaces include flexible and generic research laboratory spaces and correlating supporting spaces that can accommodate a wide range of potential programs with modest research program-specific build-out. The upgrades would immediately benefit current recruitment efforts in the Baskin School of Engineering, and Physical and Biological Sciences Division. Long-term benefits include having flexible research space readily available in Building C so that minor renovations for new faculty can be performed when needed. The Detailed Project Program should address the overarching objectives of providing flexible space capable of adapting to changing program and technological requirements; leverage existing labs and supporting spaces recently renovated and identify the most cost-effective solutions for achieving quality building systems with infrastructure resiliency. The Master Architect will provide services beginning with program validation. Schematic design will follow along with preparation of Performance Criteria Documents, which consists of project program, budget projections, site/ building planning, code analysis, development of diagrammatic plans, performance specifications, and subsequent reviews for criteria compliance. Interested firms will be required to submit a Statement of Qualifications ("SOQ") and other documentation demonstrating related experience, using standard forms to be provided by the University. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each candidate firm may be require to show evidence of its equal employment opportunity policy. If there are any PlanRoom related questions, please contact Dave Sullivan at 831-246-2073 or dsulliv1@ucsc.edu. For any RFQ or project questions, please contact Dave Sullivan at (831)-246-2073 or dsulliv1@ucsc.edu. Firms shortlisted for interview will be notified by Mid November 2024. Interviews are tentatively scheduled between early November. Notification of our selection will be provided by Friday, December 20, 2024. All qualification packets are to be submitted on the University's standard forms Deadline for Questions Regarding the RFQ: 2:00 p.m. PST Friday, October 4, 2024. Responses to Questions Regarding the RFQ: Wednesday, October 9, 2024.

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,930,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
58
Bidding Soon
1,280
All Active Projects
551
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2024

December 30, 2024

img_map_placeholder

2300 Delaware Ave, Santa Cruz, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.