BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in McLean, Illinois. Working plans call for the renovation of a municipal facility.

As of September 12, 2024, project has been cancelled. Project will rebid but no definite date yet. Maintenance Building Roof Replacement The successful Bidder will be required to provide a performance bond and payment bond in the amount equal to 100% of the contract price upon successful negotiation and execution of a contract for construction. The Mt. Hope Funks Grove Park District reserves the unrestricted right to reject any and all bids received, to waive any informalities or irregularities in bids submitted, or to accept the bid considered to be in the best interest of the Park District. The contractor will enter into a contract with the Mt. Hope Funks Grove Park District for the following Roof Replacement. The contractor must provide all necessary labor, material and equipment, and must dispose of all materials. Base Bid Mt. Hope-Funks Grove Park District Building 107 North West Street, McLean, IL 61754 - Maintenance Building Roof. The prices are to include the furnishing of all materials, equipment, tools, insurance, bonds, warranties, and all other facilities, and the performance of all labor and services necessary for the proper completion of the Work except as may be otherwise expressly provided in the Contract Documents. This Maintenance Building Roof Replacement job is the result of severe storm damage and is an insurance claim. The contractor will be working with our insurance company. Maintenance Building Replacement Roof 124x44 Removal and disposal of existing damaged roof must be done prior to installation of replacement roof. Dumpsters will need to be rented. Replace tectum decking Replace tectum track system Remove and replace all ISO board (2" and 3" panels) and Pitch roof to back side Remove and replace single-ply membrane mechanically attached 45 mil (TPO) Replace 2x10 sill trim plate Carpenter framer Wrap custom facia for parapet walls Removal and replacement of commercial box gutters (6" in size)

Final Planning

Municipal

$100,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
35
Bidding Soon
404
All Active Projects
212
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2024

March 12, 2025

img_map_placeholder

107 N West St, McLean, IL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.