BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Pomona, California. Contact the soliciting agency for additional information.

Reference Number : 0000362237 The scope of work consists of cleaning up one site location (San Antonio) and capping utilities at two other locations (Garey Village, and ACE) where the district removed all portable buildings. This project will include infilling foundation pits, remove and haul away all debris, asphalt, playground equipment, remove cut/grind any electrical stub ups, bolts, metal, and locate and cap all utilities below grade at the property line. In addition, this project includes specific scope for each site specified in the bid documents. Each bidder's bid must be accompanied by one of the following forms of bidder's security: (1) cash; (2) a cashier's check made payable to the District; (3) a certified check made payable to the District; or (4) a bidder's bond executed by a California admitted surety as defined in Code of Civil Procedure Section 995.120, made payable to the District in the form set forth in the Contract Documents. Such bidder's security must be in an amount not less than ten percent (10%) of the maximum amount of bid as a guarantee that the bidder will enter into the proposed Contract, if the same is awarded to such bidder, and will provide the required Performance and Payment Bonds, insurance certificates and any other required documents. Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount, are required, and shall be provided to the District prior to execution of the Contract and shall be in the form set forth in the Contract Documents. The Contract Time is 60 consecutive calendar days. Liquidated Damages shall be $500.00 per day for every calendar day after Substantial Completion Labor Compliance Requirements All contractors must comply with the all applicable labor compliance requirements under the California Labor Code, including but not limited to, registration with the Department of Industrial Relations (Labor Code Sections 1771.1(a) and 1725.5), 1771, 1771.4, 1773.2, 1774, 1776, 1777.5, 1813, and 1815

Post-Bid

Educational

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
93
Bidding Soon
2,206
All Active Projects
979
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2024

October 30, 2024

img_map_placeholder

Multiple Locations, Pomona, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.