BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work and new construction of a fire / police facility in Colonial Heights, Virginia. Conceptual plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

Update: This project provides funding for the design and construction of Stumpy Lake Dam structural improvements and upgrade of dam, spillway, and outfalls, as well as acquisition of necessary easements and right-of-way to meet regulatory requirements and support the function of the lake as a raw water resource.The new fire station will replace the current Fire Station 1 which was originally built in the 1950's. The current facility is too small to accommodate larger apparatus and career staff that occupy the building. The current building is suffering from structural defects. Personnel must exit the building in variable weather conditions to manuever around the apparatus. The current HVAC system is not insulated Project is included City of Colonial Heights Beach Fiscal Year 2026-2030 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- New Fire Station to replace the current Fire Station 1 which was originally built in the 1950's. Current facility is too small to accommodate larger apparatus and career staff that occupy building 365 days a year. Location of new facility is "TBD" as a site closer to the Southpark Mall corridor is preferred. Significant development in the Southpark area including mid-rise hotels and large numbers of retail visitors to the City are not in close proximity to the current fire station 1. Even though this is one of the most populated areas it is one of the longest response areas for Fire and EMS; Project will improve quality of service, reduce response times, and provide ability to relocate the Tower Ladder / Quint to the areas containing midrise buildings. As of September 10, 2024, this project is included in the city's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Fire / Police

$4,500,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
97
Bidding Soon
1,325
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2029

Project location map

100 Highland Ave, Colonial Heights, VA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.