Site work for a bridge / tunnel in Orem, Utah. Working plans call for site work for a bridge / tunnel.

Alpine Aqueduct Reach 1 Replacement and Resiliency Project Description of Work: the Central Utah Water Conservancy District ("District") is Requesting Interested Tunnel Contractors to Submit Prequalification Proposals to Construct the Alpine Aqueduct Reach 1 Replacement and Resiliency Project. Project Location: the Project is in Orem, Utah County, Utah. Prequalification: Prequalification for This Project is Required by the District. Only Prequalified Tunnel Contractors Will Be Allowed to Submit a Bid. RFQ and Project Contact Information Bruce Ward, P.E. Chris Elison, P.E. Chief Engineer, CUWCD Project Manager, CUWCD 1426 E 750 N Suite 400 1426 E 750 N Suite 400 Orem, Utah 84097 Orem, Utah 84097 Phone: (801) 226-7100 Phone: (801) 960-5373 Email: bward@cuwcd.gov Email: chrisE@cuwcd.gov All questions regarding the Project or the RFQ must be submitted by Friday, September 20, 2024 by noon by Mountain Daylight Time and may only be submitted via email to both the Chief Engineer and the Project Manager listed above. If any Bidder contemplating submitting a Bid for the proposed Contract is in doubt as to the true meaning of any part of the Plans, Specifications, or other proposed Contract documents, or finds discrepancies in or omissions from the Plans or Specifications, the Bidder may submit to the Owner a written request for an interpretation or correction thereof. Person submitting the request will be responsible for its prompt delivery. Any interpretation or correction of the proposed documents will be made only by Addendum duly issued and a copy of such Addendum will be mailed or delivered to each person receiving a set of such documents. The Owner will not be responsible for any other explanations or interpretations of the proposed documents. SITE OF WORK: Northeast bench area of Orem, Utah. Work in streets is in 1060 North and 1360 East from 1360 East to 1560 East. The rest of the Work is in lands to the north owned by Cascade Seddie LLC and CUWCD. All Questions Should Be Directed Through Project mates. Notification of Prequalified Contractors: All Prospective Tunnel Contractors Will Be Notified by Friday, October 4, 2024, if They Have Been Prequalified and Approved to Submit a Bid on the Project. The Central Utah Water Conservancy District (District) is releasing this Request for Qualifications (RFQ) packet for tunnel subcontractors to submit their prequalification statements for the Alpine Aqueduct Reach 1 Replacement and Resiliency Project (Project). The tunnel contractor will work as a subcontractor to the AA-1 Project general contractor. The submittal requirements for prequalification statement and the evaluation criteria are included herein. Response to this packet is to prequalify tunnel subcontractors for the Project. The Project is needed to replace and realign a segment of the existing Alpine Aqueduct Reach 1, a federal facility located in Orem, Utah, due to ongoing geological hazards. The Project is approximately 6,090-foot long pipeline and will include welded steel pipe up to 108 inches in diameter, cement lined with tape and mortar coating, 600 feet of 102.7-inch diameter Hazard Resilient Ductile Iron Pipe (HRDIP) at two Wasatch Fault crossings, two 108-inch x 90-inch connections to the existing Alpine Aqueduct Reach 1 Pipeline, street excavation and restoration, utility relocations, and appurtenant pipeline facilities. The Project also includes the construction of a 960-foot long tunnel with a 65-foot vertical shaft constructed with a raised bore. The tunnel also has a 250-foot radius turn in it which requires a drill and blast tunneling construction. The Project is planned to bid in the late summer/early fall 2024, with an award in October 2024 contingent upon right of way acquisitions. The design and construction of Project is being managed by the District under agreements with the U.S. Department of the Interior-Central Utah Water Project Completion Act Office (CUPCA Office).

Final Planning

Bridges / Tunnels

$400,000.00

Public - State/Provincial

Site Work

110

30

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
32
Bidding Soon
516
All Active Projects
196
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 25, 2024

January 2, 2025

img_map_placeholder

To Be Determined, Orem, UT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.