EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 4, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a power facility in Templeton, Massachusetts. Completed plans call for the renovation of a power facility.

Templeton Municipal Light & Water Plant (TMLWP) requests sealed proposals for Protection System Upgrades, North Baldwinville Substation. Templeton Municipal Light & Water Plant reserves the right to reject any or all Proposals if deemed in the best interest of the Light Plant and the Town of Templeton, Massachusetts. General Description of Work The Contractor is to complete all work as described in Section 01010 Summary of Work and on the Contract Drawings and as further required by all Addenda. B. The Contractor shall commence work as soon as practical following Contract Award. F. The Contractor shall reach substantial completion on or before June 1, 2025, and final completion on or before July 1, 2025. G. The Contractor shall construct all appurtenances in exact accord with the Contract Documents which are made a part of this agreement and the Contractor shall make no deviations from or change in such Contract Documents without the written consent or direction of the Owner.

Bid Results

Power Plant

$294,492.00

Public - County

Renovation

40

10

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
419
Active Projects
247
Bidding Soon
2,889
All Active Projects
1,325
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

November 18, 2024

img_map_placeholder

To Be Determined, Templeton, MA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.