BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Tucson, Arizona. Completed plans call for the renovation of a detention facility.

The Federal Bureau of Prisons (FBOP), Federal Correctional Complex in Tucson, Arizona intends to make a single award to a responsible entity to provide all necessary labor, materials, and incidentals to repair three tower roofs located at FCC Tucson (USP) 9300 S Wilmot Rd. Tucson, AZ 85756. The contractor is responsible for repairing each roof and install/resecure all siding materials. All equipment specified in this statement must be brand name or an equal product. Should your firm choose to submit an equal product, you must submit all technical specifications of the equal product to be analyzed and a technical determination issued with acceptance/non-acceptance. The government retains the right to determine technical acceptance for all submitted equal products. B. SCOPE OF WORK The contractor shall be responsible for labor, removing all existing materials, and equipment as well as what is necessary to complete the scope of work. The product must be installed per the manufactures' specifications. Coordinate all safety regulations with FCC Tucson Set up all safety according to OSHA standards Tear off 3 tower roofs equaling approximately 1875 SF down to the 20 ga. B decking. Mechanically fasten 1 layer of 2" Polyiso insulation, tapered insulation and cover board. Install Tremco, BURmastic Composite Ply HT in POWERply Endure BIO Adhesive per manufacturer requirements. Install Tremco Permafab reinforcing fabric in AlphaGuard PUMA Base Coat @ the rate of 2.5 ga. Per sq. per manufacture requirements. Install Tremco AlphaGuard PUMA base coat @ the rate of 2.5 ga. Per sq. over reinforcing fabric per manufacture requirements. Install Tremco, AlphaGuard PUMA Topcoat over base coat @ the rate of 2 ga. Per sq. per manufacture requirements. Install all wood nailers, siding closure and edge metal. Drill through the face of newly installed metal edge with self-tapping metal screws to increase wind uplift strength. Drill through the face of the already existing drip edge face and secure the roofing termination to the structural perimeter support member on towers where roof is not being replaced. Clean up all debris removed from towers prior to install of new Tremco roof system. Clean up and remove all debris used at the end of each day and at the end of the project. Remove any unused materials as we cannot store them at the institution. USP Tucson staff will ensure a representative is present to allow access to all areas requested by the Contractor. It shall be the contractor's responsibility to obtain all measurements and manufacture installation recommendations. The FBOP will occupy the site during the entire construction period. The contractor shall perform the work to not interfere with the FBOP's operations as minimally as possible. C. UTILITIES The FBOP will provide minimal electricity service (120V), for battery chargers, radios, small hand tools, etc. In addition, provide restroom services, and water. The contractor will provide all other supplies and materials needed to complete this project. D. TESTING AND ACCEPTANCE The Contractor shall notify the Contracting Monitor two (2) days prior to the final system testing and certification so that arrangements can be made to have BOP required staff available to observe testing. The contractor awarded the contract will be responsible to ensure the premises are kept clean and free from accumulations of waste materials and rubbish at all times. The contractor will remove all debris, scrap, and rubbish from the work area daily. Surplus materials and all equipment shall be promptly removed from the site upon completion of the work. The Contractor shall be responsible to remove all debris and waste materials from the job site at USP Tucson upon conclusion and acceptance of the project. These items must be disposed of in accordance with all Federal, State, and local laws. E. SUBMITTALS & TRAINING Submittals: 1. The contractor shall provide written submittals to the COR describing recommended equipment within 15 days from receiving the Notice to Proceed for approval. 2. All security clearance paperwork/documentation shall be submitted to the COR, a minimum of ten working days prior to the start of work. 3. The Contractor shall provide to the COR (3) copies of the Material Safety Data Sheets (MSDS) on all materials and substances that may be used during the project. In the event the material is not approved by the Safety Manager, it shall be the responsibility of the Contractor to locate and procure an alternative product. 4. For security and safety purposes, forty-eight (48) hour advance notice in writing, prior to disruption to the system must be given. Training: Upon completion of the installation, testing, and acceptance by the Government, the contractor shall provide operation/maintenance manuals for each piece of equipment/system installed. Two copies of any required software and associated manuals shall also be supplied to the institution. The contractor shall furnish manufacturer's training and provide training to two (2) Bureau of Prisons employees, thus enabling them to maintain and repair all equipment and systems. Training shall include operations and maintenance of each system. II. CONTRACTOR SECURITY/WORKING REGULATIONS A. Work Hours: Work Hours for the contractor are 7:00 AM - 3:00 PM, Monday - Friday, excluding weekends and federal holidays. Any work required to be completed at any other time than noted above must be requested in writing to the COR five (5) working days prior to the start of the work and must be approved by the Warden. In the event of any equipment being replaced that would result in downtime of the normal orderly running of the institution, alternate work hours may be authorized in accordance with the time frame stated above. Access to the site will be available during normal working hours except during emergencies. It shall be the responsibility of the Contractor to familiarize himself, his employees, and his subcontractors of the working hours and conditions in the correctional facility, as working hours may not constitute a full eight-hour work day. The Government assumes no responsibility to the Contractor nor to any of his subcontractors for shorter hours due to institutional emergencies or entry and/or exit of workers necessitated by normal institution routines. Contractors should plan for a certain amount of time accrued for security considerations, i.e., check-in screening, delay due to inmate movements, institution lock-down, institution emergencies, etc. In the event of an institution emergency, the Contractor will be instructed to secure all work, secure and stow all tools, equipment and materials, and the Contractor will be escorted out of the institution. Work will resume once the institution emergency passes. B. Delivery of Materials: All construction materials/equipment required for work on this project is required to be processed by the Contractor and coordinated with the institution COR for temporary storage. Any construction related deliveries which are directly shipped to the contractor can be received between the hours of 7:30 a.m. to 2:00 p.m., Monday through Friday, excluding Federal Holidays. At no point will a Bureau of Prisons (BOP) staff member receive or sign for a delivery if the contractor or his representative is not present to verify and accept the delivery. Under no circumstances will USP Tucson or its staff be responsible for the acceptance of any Contractor or company deliveries. The contractor shall be responsible for providing their own means of loading and unloading contractor material or equipment. The contractor shall not use the institution entry/driveway for the loading, unloading, or storage of any materials and equipment. The contractor will not impede/block the driveway at any time during or after the work shift. C. Storage of Materials and Equipment: All construction materials/tools shall be stored in a designated area mutually agreed upon between the COR and the contractor. The storage area will be a secure lockable gang box or similar, size to be determined by the contractor and the COR. If required, the contractor shall provide a securable, single point access storage container, such as a Job or Gang Box that will be left in the agreed upon storage area for the duration of the project. Size of the storage container will be determined by the contractor and the COR. The container will be secured using a padlock protocol with two locks to secure it. One shall be a contractor lock and the other lock provided by the institution. If necessary, a heavy-duty chain provided by the contractor may be used to facilitate the locking requirement. All materials and equipment stored within the container will be maintained in a safe and orderly fashion. All tools will be inventoried prior to entering the institution and will be inventoried back in to ensure accurate accountability when exiting the institution at the end of each workday. Materials cannot be stored at a height that would create a fall hazard. All tools will be inventoried prior to entering the Institution. At the start of each workday all tools will be inventoried out on a daily tool inventory sheet and at the end of the workday all tools will be inventoried back in to ensure accurate accountability of all tools at the end of each workday. All contractor owned extension cords that will be used during the project, regardless of length, shall be in good condition with no broken outer insulation. Extension cords are considered a "high risk" tool having a Federal Bureau of Prisons' tool classification of Double A. All contractor owned extension cords used for this project will be required to exit the institution at the end of every workday for the duration of the project. All contractor owned ladders approved for use within the institution, regardless of the size, shall be stored in a pre-determined area and secured to a stationary fixture with a heavy link chain and lock which would prevent removal. D. Security Clearance/Contractor Badges: The contractor shall provide the COR with all the necessary security clearance documents for all contractors and subcontractor employees accessing the institution and be security cleared for badging within 10 days of receiving the Notice to Proceed, as stated above. Security clearance documents will only be accepted from the prime contractor. If submitted by a sub-contractor, they will be rejected. It is the prime contractor's responsibility to review security clearance submissions to ensure they are complete. In the event a contractor or subcontractor employee cannot pass the security clearance process, it will be the contractor's responsibility to provide another candidate. By law the BOP cannot, and will not, release any information to the contractor concerning the nature of why a contractors or subcontractor employee was not able to pass the security clearance process. All contractors/subcontractors working at USP Tucson will be issued and required to wear a picture ID/contractor badge provided by the institution. For security reasons, the badge will be worn in a visible manner as directed by the COR. All contractors and subcontractor employees will provide a check list of all employees on site each day to the COR, verifying the number of workers on site each day and that all workers are approved to be on site. E. Safety and Personal Protective Equipment: All contractors and employees shall have and wear the required personal protective equipment (PPE) prescribed by industry standards at all times while on the job site. It is the responsibility of the contractor to provide all PPE equipment. If ladders are required, immediately consult with the COR to ensure the COR can make timely notification to appropriate institution staff. Should a system require Lock-out/Tag-out, the system will be required to have both Contractor and USP Tucson locks on the isolation point to prevent shock. All Lock-out/Tag-out procedures will be in compliance with the institution Lock-out program. F. Additional Considerations: 1. Contractors will NOT be allowed to bring cell phones, cameras or two way pagers into USP Tucson. The Facilities Department maintains a digital camera that will be utilized by BOP staff to document the project work. The Contractor may request copies of these documentation photos for record keeping. 2. Contractor will be permitted to wear jeans in the institution, however, green or khaki-color clothing will not be allowed. The clothes will be proper and suitable for the services that are being provided. 3. Lunches will be consumed at the work site. Contractor shall ensure they have everything they need for their lunch when they check-in first thing in the morning. 4. Federal smoking policy on Federal property states that smoking is only allowed in designated areas. This policy will be strictly enforced.

Post-Bid

Jails / Prisons

$80,000.00

Public - Federal

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
8
Bidding Soon
161
All Active Projects
54
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 19, 2024

October 21, 2024

img_map_placeholder

9300 S Wilmot Rd, Tucson, AZ

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.