BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 31, 2024 at 7:00 PM

Updated January 1, 2025

Demolition, site work and new construction of a mixed-use development in Valdez, Alaska. Completed plans call for the construction of a water / sewer project.

Remove the existing 4,000-gallon underground storage tank and install a 3,000-gallon above ground storage tank at Marine Safety Unit. Remove the existing fuel oil boiler, piping, and storage tank and install an electric boiler at Cutter Support Building. Optional bid items 1 and 2 are to properly dispose of contaminated soil and to install a canopy over the tank at the MSU respectively. The work includes the following: Work for this construction project includes all labor, materials, equipment, and materials reqired for accomplish the work. Work includes excavation, backfill, removal of equipemtn above ground and undergroud, all required permits, all regulatory requirements, demolistion of components,connection to existing equipment, install of new equipment, modifications to system for new work, and protection of existing.

Post-Bid

Water / Sewer

$3,500,000.00

Public - Federal

Demolition, New Construction, Site Work

56

17

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
3
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2024

December 9, 2024

Project location map

To Be Determined, Valdez, AK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.