Published November 8, 2024 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Middletown, New York. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000362414 The Work consists of the following: Replacing existing storm drainage structures and piping Installation of new curb and drainage connections from 507 to 549 East Main Street Concrete curb ramp upgrades to meet ADA requirements Full replacement of existing traffic signal equipment, including installation of a 360-degree video detection camera and configuration of new signal controller with provided timings at 3 intersections: Signal # 417 - CR 67 (East Main Street) and CR 92 (Dunning Road) Signal # 419 - CR 67 (East Main Street) and CR 108 (Schutt Road Extension) Signal # 420 - CR 108 (Schutt Road Extension) and Trust Way Installation of a 360-degree video detection camera, replacement of the traffic signal controller, and configuration with provided timings at 8 intersections: Signal # 404 - CR 67 (East Main Street) & Midway Road Signal #406 - CR 96 (Carpenter Avenue) & Wisener Avenue Signal #414 - CR 67 (East Main Street) & Garnet Hospital Signal # 415 - CR 67 (East Main Street) & CR 50 (Golf Links Road) Signal # 416 - CR 67 (East Main Street) & Quick Chek (Med Parc Road) Signal # 418 - CR 67 (East Main Street) & CR 96 (Carpenter Avenue) Signal # 421 - CR 92 (Dunning Road) & Gibbs Court Signal # 422 - CR 92 (Dunning Road) & CR 108 (Schutt Road Extension) & Wallkill Winning Way Milling and paving of approximately 8,600 LF (1.6 miles) of CR 67 (East Main Street) from the Town of Wallkill/City of Middletown line (just west of Anthony Street) to just east of the intersection with CR 50 (Golf Links Road) Additional milling and paving at the CR 67 intersections with CR 96 (Carpenter Avenue), CR 92 (Dunning Road), and CR 50 (Golf Links Road). Installation of epoxy pavement markings (stop bars, double yellow centerline, white fog lines, turning lane lines, lane symbols and letters, crosswalks, etc.) Question Acceptance Deadline 10/09/2024 05:00 PM EDT Questions are submitted online Awarded Contractors shall be required to provide Performance and Payment Bonds, each equal to 100% of the Contract amount and insurance coverages as specified in the Contract Documents, with the County, and Engineer named as additional insureds, and prior to Final Payment, a one (1) year Maintenance Bond against any defects in workmanship or materials in an amount equal to 10% of the Contract Price at Substantial Completion.

Bid Results

Roads / Highways

$4,249,249.00

Public - County

Paving, Site Work

49

9

9

7

Subscribe For Documents

89 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Low-Voltage Switchgear
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters

Find More Local Projects

Within 75 Miles of This Project
447
Active Projects
261
Bidding Soon
4,231
All Active Projects
1,912
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

March 17, 2025

img_map_placeholder

Multiple Locations, Middletown, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

East Main Street (CR 67) Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.