Demolition, site work, new construction, renovation and addition to a military facility in Wright Patterson AFB, Ohio. Completed plans call for the addition of a 6,000-square-foot, two-story above grade military facility; for the demolition of a military facility; for site work for a military facility; for the renovation of a military facility; and for the construction of a military facility.

Project no. P2#517945/ZHTV230817 DESCRIPTION: The U.S. Army Corps of Engineers (USACE) Louisville District has issued Request for Proposal (RFP) Solicitation W912QR-25-R-0004 for the Design-Build new construction and renovation of the Artificial Intelligence & Machine Research Cetner Capability (AIMR-2C), Building 653, Wright-Patterson Airforce Base (WPAFB), Ohio. Construction of a Two Story, approximately 6,000 square foot addition, as well as repairs to Facility 20653 to support Artificial Intelligence & Machine Research Center Capability (AIMR-2C). An existing corridor between 20653 and 20654 is to remain. The lower level will include access to the existing basement in 20653. Repairs include necessary HVAC, life safety systems, plumbing and utility alterations to accommodate connections from facility 20653 to the new addition. Minimal alterations will also be needed to the existing facility to allow entry into the new addition from facility 20653 at the ground and 1st Floor levels. A portion of the existing corridor connecting facility 20653 and 20654 will require reconfiguration repairs to accommodate the new addition. Additional work is required to relocate an existing concrete handicap ramp and repair spalling concrete on one of the corridor support columns. The Contract Duration is at five hundred and thirty-one (531) calendar days from Contract Notice to Proceed. TYPE OF CONTRACT AND NAICS: This RFP is for one (1) Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 236220 - Commercial and Institutional Building Construction. TYPE OF SET-ASIDE: This acquisition is a Full & Open competitive procurement. SELECTION PROCESS: The proposals will be evaluated using a Two-Phase Best Value Tradeoff Source Selection process. CONSTRUCTION MAGNITUDE: The magnitude of this construction project is anticipated to be between $5,000,000 and $10,000,000 in accordance with FAR 36.204. PRE-PROPOSAL CONFERENCE: A pre-proposal conference will be held for those Contractor(s) selected for the Phase II amendment. SOLICITATION WEBSITE: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at http://www.sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. POINT-OF-CONTACT: The point-of-contact for this procurement is Contract Specialist, Jacob S. Pridemore, at Jacob.S.Pridemore@usace.army.mil or 502-315-6228. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$10,000,000.00

Public - Federal

Addition, Demolition, New Construction, Renovation, Site Work

60

14

3

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Grouting, Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Steep Slope Roofing, Shingles and Shakes, Asphalt Shingles, Membrane Roofing, Roll Roofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Wall and Door Protection, Corner Guards, Storage Specialties, Lockers, Storage Assemblies, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Curtains and Drapes, Draperies, Casework, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains, Special Structures, Geodesic Structures, Geodesic Domes, Fabricated Engineered Structures
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Diffusers, Registers, and Grilles, HVAC Air Cleaning Devices
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Emergency Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Compaction, Earthwork Methods, Soil Treatment, Termite Control, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
70
Bidding Soon
1,385
All Active Projects
595
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2025

May 12, 2025

img_map_placeholder

To Be Determined, Wright Patterson AFB, OH

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP D/B - Construction Addition for AIMR-2C Research-F/20653

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.