BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Boston, Massachusetts. Completed plans call for the renovation of a municipal facility.

The Commonwealth of MA Trial Court Facilities Management Department is seeking proposals for repairs required to our fire escape per the deficiencies noted during the Certified Inspection of our fire escape at the Charlestown Division - Boston Municipal Court, 3 City Square, Charlestown, MA 02129. Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Facilities Management Department Trial Court would like to hire the following trades person to complete the project described below Fire Escape Repair Technician 1. Various connections (bolt, riveted and/or welded) with visible excessive internal rust (rust jacking) are to be repaired/reinforced, re-boltd, (no welding) cleaned and spot primed. 2. All deteriorated material will be reinforced or replaced as needed 3. All wall connections (thru-bolt or cement) must be verified to be in Fair or Good condition and ready for Certification by Load Test 4. Painting of major surface rust and corrosion will be scraped, wire brushed, spot primed and spot painted (1 coat). EPA Guidelines for Lead paint application. 5. Certification by Load Test. Guaranteed acceptance by the AHJ (Authority Having Jurisdiction) and in compliance with all Codes: IFC (International Fire Code), IBC (International Building Code), NFPA, OSHA, and any applicable State codes. This process will satisfy a 5 year certification requirement

Post-Bid

Municipal

$16,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
356
Active Projects
226
Bidding Soon
2,770
All Active Projects
1,253
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

October 28, 2024

img_map_placeholder

3 City Square, Boston, MA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.