BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2024 at 8:00 PM

Updated October 29, 2024

Site work for a civil project in Huntington, West Virginia. Completed plans call for site work for a water / sewer project.

Construction of wastewater lift stations needed to transfer wastewater to Owner's existing wastewater collection system. Work shall include construction of three (3) lift stations, upgrades to one (1) existing lift station, minor installation of gravity sewer mains and forcemains as needed to interconnect with work to be performed by others, furnishing of two (2) portable generators, and all necessary appurtenances. Bids shall be accompanied by a certified check or bid bond payable to the Huntington Sanitary Board in an amount not less than five percent (5%) of the base bid. Contract #1 - Route 10 Sanitary Sewer Extension: Extension ofOwner's wastewater collection system to neighborhoods, homes, and businesses along WV Route 10, Mt. Union Road, Green Valley Road, and environs. Work shall include installation of approximately 19,900 LF of gravity sewer mains, 4,200 LF of forcemains, three (3) grinder pump stations, interconnection with existing systems work to be performed by others, and all necessary appurtenances. Contract #3 - Lift Stations: Construction of wastewater lift stations needed to transfer wastewater to Owner's existing wastewater collection system. Work shall include construction ofthree (3) lift stations, upgrades to one (1) existing lift station, minor installation of gravity sewer mains and forcemains as needed to interconnect with work to be performed by others, furnishing oftwo (2) portable generators, and all necessary appurtenances. The goal ofthe project is to extend sewer service to approximately 300 new customers along WV Route 10 and surrounding neighborhoods, with a particular focus on the Green Valley Heights subdivision, which is currently served by a failing package WWTP. The WVDEP has ordered the HSB to provide residents of this subdivision with sewer service by February 2026. The project is divided into three (3) contracts, but due to funding constraints, only two ofthese contracts are bidding at this time. The Owner reserves the right to reject any and all bids The Work will be substantially completed and ready for final payment after the date when the Contract Times commence to run as listed above. Liquidated damages shall be $2,500.00 per day Question Deadline 09/20/2024 at 4:00 PM ET Questions will only be accepted via email to eschultz athethrasher>>i oup.com

Award

Water / Sewer

$1,486,590.00

Public - City

Site Work

40

25

18

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
64
Bidding Soon
674
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

December 2, 2024

Project location map

To Be Determined, Huntington, WV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.