Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 15, 2025 at 8:00 PM
Updated May 16, 2025
Site work and paving for a road / highway in Shawnee, Kansas. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
This section of Woodland Road is 1.2 miles in length and designated as a future arterial road. The existing road either does not yet exist or is a narrow asphalt ditch section roadway, with a typical 22-foot-wide asphalt surface. This project will require floodplain study and new alignment for a bridge structure over the western tributary to Mill Creek. Some of the new roadway may be considered for a Green Collector and some will have curb and gutter. ROW cost, existing rock, and steep topography of the area will limit the effective use of ditches. This project will include grading, widening, new asphalt, new curbs when required to control drainage, a shared use path on one side, streetlights, and storm drainage facilities. As of May 15, 2025, this project is included in the City's 2025-2034 Capital Improvement Program (CIP).Design expected to begin in January 2027 and construction in January 2028, with completion end of year 2029. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$13,800,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 2, 2028
Woodland Rd, Shawnee, KS
Related To This Project
Shawnee, KS
--
Shawnee, KS
Bid Date: Oct 02 2024
Shawnee, KS
--
Shawnee, KS
--
Shawnee, KS
Bid Date: Mar 28 2025
Shawnee, KS
--
Shawnee, KS
Bid Date: Aug 28 2024
Shawnee, KS
Bid Date: Aug 05 2024
Shawnee, KS
Bid Date: Aug 08 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
