Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a bridge / tunnel in Norwalk, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Document notes: Bidder may elect to have these documents mailed to them for an additional fee of $10.00 for shipping. Bid documents must be obtained from the Huron County Engineer, no copies will be accepted. All bid documents must be submitted bound in their entirety. Each bidder is required to furnish with its proposal a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and complexity. The owner intends and requires that this project be completed no later than July 25, 2025 . Only prequalified contractors are eligible to submit bids for this project. Bidders must be prequalified by the Ohio Department of Transportation (ODOT) in accordance with ODOT's Construction and Material Specifications Section 102. Bidders must comply with the prevailing wage rates as determined by the U.S. Department of Labor under the Davis-Bacon and related Acts. The Board of County Commissioners of Huron County reserves the right to waive any and all irregularities in the bids or bidding process and may reject any and all bids The Contractor shall furnish, at its own cost and expense, all management, labor, tools, forms, equipment, appliances, machinery, transportation, materials and other things necessary, of whatever nature, to perform the Work, and shall perform and complete, within the time limit specified, all of the Work indicated or implied by the including the Notice to Bidders, Instructions to Bidders, General & Supplemental Provisions, Standard Specifications, Scope of Work, Plans & Specifications, and Estimated Quantities prepared for this Project, including the removal of surplus or condemned materials, and the thorough cleaning of the site of the Work and structures built. In no case will any Work, in excess of such requirements, be paid for unless ordered in writing by the County as hereinafter specified. All Work shall be of the best quality throughout. Unless otherwise provided herein, all materials shall be new. 2. SCHEDULE OF PERFORMANCE At the pre-construction meeting, the Contractor must provide the Engineer with a printed schedule showing the interrelation and planned performance of all major items of Work, with completion reasonably scheduled thereon to occur by the scheduled completion date recited herein. The Engineer shall review and consider acceptance of the schedule as provided by section 108.02 (B) (1) of the Standard Specifications
Award
Bridges / Tunnels
$298,707.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 4, 2024
November 4, 2024
To Be Determined, Norwalk, OH
Related To This Project
Norwalk, OH
Bid Date: Oct 17 2024
Norwalk, OH
Bid Date: Oct 25 2024
Norwalk, OH
--
Norwalk, OH
--
Norwalk, OH
Bid Date: Aug 15 2024
Norwalk, OH
Bid Date: Jul 19 2024
Norwalk, OH
Bid Date: Jul 02 2024
Norwalk, OH
Bid Date: Apr 05 2024
Norwalk, OH
Bid Date: Mar 29 2024
Norwalk, OH
Bid Date: Mar 29 2024
Norwalk, OH
Bid Date: Mar 28 2024
Norwalk, OH
Bid Date: Apr 05 2024
Norwalk, OH
Bid Date: Mar 29 2024
Norwalk, OH
Bid Date: Mar 29 2024
Norwalk, OH
Bid Date: Mar 15 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.