Published January 13, 2025 at 7:00 PM

Updated January 14, 2025

Site work and new construction of a water / sewer project in Licking, Missouri. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The Licking Northwest Wwtp Improvements - Phase 1 for the City of Licking, Missouri - Lump Sum Bids Shall Be Received for Work Including but Not Limited to: Construction of a New 2,544 Sf Laboratory Building. The Facility Shall Consist of a Reinforced Concrete Shallow Foundation System, 6 in Metal Stud Wall System With 4 in Cmu Veneer, Standing Seam Roof Over Plywood Decking Over Wood Roof Trusses. Construction Shall Include All Mechanical, Electrical and Plumbing Improvements to Afford a Complete and Functional Laboratory Facility. New Headworks Facility for Preliminary Treatment of Raw Influent Wastewater. The Facility Shall Consist of Reinforced Concrete Flow Channel and Shallow Foundation System, 8 in Reinforced Cmu Walls, And Standing Seam Roof Over Galvanized Steel Decking Over Galvanized Steel Roof Trusses. Construction Shall Include All Mechanical and Electrical Improvements Necessary for a Complete and Functional Facility. Improvements Shall Include the Design, Fabrication, Installation, Start-up and Warranty of Complete Macerator-grinder and Fine Screen/washer Compactor Equipment Packages. Construction of a New Reinforced Concrete Secondary Clarifier Flow Splitter Structure to Include the Design, Fabrication, Installation, and Start-up of Flow Control Gates. Modifications to the Existing Tertiary Filtration Building to Afford the Installation of New Surface Filtration Equipment. Two Alternative Equipment Configurations Shall Be Considered for Implementation at The Site. Improvements for Each Alternative Shall Include the Design Fabrication, Installation, Start-up and Warranty of Complete Surface Filter Equipment Packages. Miscellaneous Electrical Improvements, to Include Refurbishment of the Existing Motor Control Center Equipment, Supply of a New Automatic Transfer Switch, a New Diesel Engine Driven Emergency Standby Generator Equipment Package and New Electrical Feeders to Supply New and Existing Processes. Non-discrimination in Employment - Bidders on This Work Will Be Required to Comply With the President's Executive Order Number 11246. Requirements for Bidders and Contractors Under This Order Are Explained in the Specifications. In Accordance With the Federal Funding Accountability Act of 2006, the Contractor Assures That It, as Well as It's Subcontractor(S), Shall Register in the System for Award Management (online). Requirement is Further Explained in the Specifications. Attention of Bidders is Particularly Called to the Requirements as to Conditions of Employment to Be Observed and Minimum Wage Rates to Be Paid Under the Contract, Section 3, Segregated Facility, Section 109, and E.o. 11246.

Award

Water / Sewer

$3,569,000.00

Public - City

New Construction, Site Work

115

26

21

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
40
Bidding Soon
460
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 14, 2024

Project location map

125 S Main St, Licking, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.