Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Kewanee, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Work includes Hot-Mix Asphalt resurfacing of Various Streets including HMA Surf. Rem. (Cold Milling), HMA Surface Course-IL4.5, HMA Surface CourseIL9.5FG, Sidewalk Removal and Replacement, Curb & Gutter Removal and Replacement, Manhole Lid Adjustment, Valve Adjustment, Paint Pavement Markings and other related items. This project is located in the City of Kewanee, Illinois on Various Streets within the City Limits. Pre-Qualification is required to bid this project. Concrete items shall be completed prior to the placement of the HMA Surface Course. HMA SURFACE REMOVAL - BUTT JOINT and HMA SURFACE REMOVAL, VARIABLE 0"-1", 6' WIDE This work shall be done in accordance with the appropriate articles of Section 406 and 440 of the Standard Specifications. Removal shall be done in accordance with the typical sections shown on the plans and shall consist of removing existing HMA or Portland Cement Concrete patches from the pavement structure to the depth specified or as according to the Engineer to insure a proper finished cross slope. No payment will be made for additional HMA Binder Course or HMA Surface Course to correct unauthorized additional depth of milling. Any area within the project limits that cannot be reached by the milling machine is to be removed by other means. This will include areas at headers and butt joints, areas around manholes and valves, and along the curb and gutter. At all limits of the milling, a clean, full width joint shall be saw cut and material removed to obtain a clean, straight edge to the depth of milling. This removal will be considered incidental to the milling operation and no other payment will be made. All grindings shall be stockpiled in an area designated by the City of Kewanee and shall become property of the City. This work shall be paid for at the Contract Unit Price per SQUARE YARD of HMA SURFACE REMOVAL, BUTT JOINT of HMA SURFACE REMOVAL, VARIABLE 0-1", 6' WIDE. This work shall be done in accordance with Section 424 of the Standard Specifications. It shall be the Contractors responsibility to determine how the requirements of the Highway Standards for Curb Ramps are to be met. The Engineer will assist only with determining the configuration most applicable to each individual ramp. Construction of the ramps may require the utilization of a combination of the methods shown on the Highway Standard depending on actual field conditions. PCC Sidewalks shall be replaced at 4" thickness, minimum. Any additional fill material required to correct over excavation or to prepare the subgrade to the required grade for sidewalk and curb installation shall be CA-6 coarse aggregate compacted with a vibratory plate compactor to the satisfaction of the Engineer. Asphalt grindings may be substituted for the CA-6 aggregate when approved by the Engineer in the field. Furnishing, placing and compacting said fill material will be considered incidental to the applicable curb and sidewalk pay item. PCC Sidewalk, will be measured and paid for at the Contract Unit Price for SQUARE FOOT of SIDEWALK REMOVAL AND REPLACEMENT. The square foot measurement for side curbs in the ramps will be in the horizontal plane and no additional payment will be made for additional thickness of the sidewalk in the side curbs.
Award
Roads / Highways
$553,333.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 23, 2024
October 23, 2024
Multiple Locations, Kewanee, IL
Related To This Project
Kewanee, IL
Bid Date: Oct 16 2024
Kewanee, IL
Bid Date: Oct 18 2024
Kewanee, IL
Bid Date: Oct 14 2024
Kewanee, IL
Bid Date: Oct 14 2024
Kewanee, IL
Bid Date: Nov 15 2024
Kewanee, IL
Bid Date: Nov 15 2024
Kewanee, IL
Bid Date: Sep 23 2024
Kewanee, IL
Bid Date: Sep 10 2024
Kewanee, IL
Bid Date: Sep 17 2024
Kewanee, IL
Bid Date: Aug 06 2024
Kewanee, IL
Bid Date: Aug 06 2024
Kewanee, IL
Bid Date: Aug 06 2024
Kewanee, IL
Bid Date: Jul 16 2024
Kewanee, IL
Bid Date: Jul 12 2024
Kewanee, IL
Bid Date: Dec 01 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.