Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in San Luis Obispo, California. Completed plans call for the renovation of a educational facility.
Project Description: 1. The contractor shall review and follow the current SLCUSD Specifications. 2. Replace irrigation main lines, laterals and sprinkler heads. Adjust head locations and number of heads per zone as necessary for optimal coverage. 3. Contractor to ensure field irrigation is divided into two logical sections for future field maintenance. (left field can be repaired while right field can be used by school) 4. Install 1 1/2 inch conduit between irrigation valve boxes to use for two wire control system. 5. Replace the irrigation booster pump with Pentair VFD controlling a Berkley pump. 6. Install district supplied Netafim hydrometer hydraulic valve. 7. Install EZ-Flo HF-086 injection system on the irrigation main, downstream of the booster pump and hydrometer. 8. Install approximately 28' of new 6ft chain link, to create a pump yard between buildings, for controller, booster pump, EZ Flo, Valves, Etc. 9. Strip and grade field, remove spoils, add 2 inches of soil amendment for sod, install sod. Total area of field renovation is approximately 180,000 sq ft. This process will be completed in two phases to allow the school use of part of the field during construction. 10. Renovate both baseball infields with 1/3 clay, 1/3 gravel and 1/3 sand mixture. Verify infield quick couplers are behind the pitcher's mound, are functional and valve boxes are at grade. 11. Replace all chain link mesh with class one, nine gauge, galvanized before weave, 2" mesh on approximately 20' tall baseball backstops. Repair or replace posts as necessary. Match all existing heights and widths. Replace 120 ft. 2x12 pressure treated Douglas fir on backstops. Ensure that there is an overlap where wood and chain link meet. 12. Remove and replace approximately 200 cubic yards (16,000 sq.ft. 4 inches deep) of surface dirt, from the backstop to the edge of the field, with non-stabilized DG. 13. The contractor will be responsible for complete and full irrigation function and coverage. 14. The contractor shall maintain the new sod for no less than 90 days after installation. 15. The contractor shall generate an ideal annual watering schedule and program all settings to maintain a proper watering schedule. Schedule: 1. Anticipated construction start is November 2024. 2. Duration: 6 Months Construction Budget: 1. $745,325 Questions regarding documents, discrepancies, omissions, or doubt as to meanings shall be referred immediately to the Owner who will send written instructions clarifying such questions to each bidder. Questions regarding Bid #328 may be directed in writing only to the Facilities Analyst II, Kelly Lee, at klee@slcusd.org, and must be submitted no later than 02:00 p.m., Thursday, September 26, 2024. Oral responses will not be binding on the Owner or Architect or any Construction Manager. Project Description: 1. The contractor shall review and follow the current SLCUSD Specifications. 2. Replace irrigation main lines, laterals and sprinkler heads. Adjust head locations and number of heads per zone as necessary for optimal coverage. 3. Contractor to ensure field irrigation is divided into two logical sections for future field maintenance. (left field can be repaired while right field can be used by school) 4. Install 1 1/2 inch conduit between irrigation valve boxes to use for two wire control system. 5. Replace the irrigation booster pump with Pentair VFD controlling a Berkley pump. 6. Install district supplied Netafim hydrometer hydraulic valve. 7. Install EZ-Flo HF-086 injection system on the irrigation main, downstream of the booster pump and hydrometer. 8. Install approximately 28' of new 6ft chain link, to create a pump yard between buildings, for controller, booster pump, EZ Flo, Valves, Etc. 9. Strip and grade field, remove spoils, add 2 inches of soil amendment for sod, install sod. Total area of field renovation is approximately 180,000 sq ft. This process will be completed in two phases to allow the school use of part of the field during construction. 10. Renovate both baseball infields with 1/3 clay, 1/3 gravel and 1/3 sand mixture. Verify infield quick couplers are behind the pitcher's mound, are functional and valve boxes are at grade. 11. Replace all chain link mesh with class one, nine gauge, galvanized before weave, 2" mesh on approximately 20' tall baseball backstops. Repair or replace posts as necessary. Match all existing heights and widths. Replace 120 ft. 2x12 pressure treated Douglas fir on backstops. Ensure that there is an overlap where wood and chain link meet. 12. Remove and replace approximately 200 cubic yards (16,000 sq.ft. 4 inches deep) of surface dirt, from the backstop to the edge of the field, with non-stabilized DG. 13. The contractor will be responsible for complete and full irrigation function and coverage. 14. The contractor shall maintain the new sod for no less than 90 days after installation. 15. The contractor shall generate an ideal annual watering schedule and program all settings to maintain a proper watering schedule. Schedule: 1. Anticipated construction start is November 2024. 2. Duration: 6 Months Construction Budget: 1. $745,325
Post-Bid
Educational
$745,325.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 4, 2024
November 4, 2024
Multiple Locations, San Luis Obispo, CA
Related To This Project
San Luis Obispo, CA
Bid Date: Oct 24 2024
San Luis Obispo, CA
Bid Date: Oct 24 2024
San Luis Obispo, CA
Bid Date: Oct 24 2024
San Luis Obispo, CA
--
San Luis Obispo, CA
Bid Date: Nov 05 2024
San Luis Obispo, CA
Bid Date: Oct 22 2024
San Luis Obispo, CA
Bid Date: Oct 21 2024
San Luis Obispo, CA
Bid Date: Nov 04 2024
San Luis Obispo, CA
Bid Date: Oct 03 2024
San Luis Obispo, CA
Bid Date: Oct 03 2024
San Luis Obispo, CA
Bid Date: Oct 03 2024
San Luis Obispo, CA
Bid Date: Dec 10 2024
San Luis Obispo, CA
--
San Luis Obispo, CA
Bid Date: Sep 19 2024
San Luis Obispo, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.