BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 18, 2024 at 7:00 PM

Updated December 19, 2024

Site work for a water / sewer project in Boston, Massachusetts. Completed plans call for site work for a water / sewer project.

The Massachusetts Water Resources Authority will receive for Intermediate High Pipeline Improvements CPI Sections 75A and 47, The work includes: all labor, materials and equipment necessary for the installation of pipelines, valves, and appurtenances and rehabilitation of existing water pipelines and water meters in the Town of Belmont, City of Boston, City of Newton, and City of Watertown. The estimated timeframe for project completion is 912 days. The work is being bid pursuantto M.G.L. c. 30, sec. 39M. The estimated project cost is: $25,619,800.00. This contract is subject to a 7.24% MBE and a 3.6% WBE participation requirement. The Work includes all labor, materials, and equipment necessary for the installation of pipelines, valves and appurtenances, and rehabilitation of existing water pipelines and water meters in the Town of Belmont, City of Boston, City of Newton, and City of Watertown as specified and as indicated. The Work includes the Section 75A water main extension in Newton, the replacement of Newton's local water on Ward Street, the Meter 111 replacement in Belmont, and the rehabilitation of Section 47 in Boston and Watertown.

Award

Water / Sewer

$22,580,000.00

Public - State/Provincial

Site Work

119

24

38

11

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
571
Active Projects
329
Bidding Soon
4,078
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2024

December 31, 2024

Project location map

Multiple Locations, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.