Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 5, 2024 at 7:00 PM
Updated December 6, 2024
Remodeling of a pre-engineered storage facility in Feura Bush, New York. Completed plans call for the remodel of a pre-engineered storage facility.
Reference Number 0000363247 The City of Albany MWBE Subcontractor and Minority/Women Labor Participation Policy also applies to this project. This contract has a MWBE subcontractor participation goal of 15%. Subcontractorsmay be City or State-Certified MWBEs. Note this percentage is not in addition to the NYSEFC participation. This Contract also has a Minority/Women Labor Participation goal of 30% of the total labor force hours This project is a Wick's Law project and contains bidding opportunities for General, Electrical, Mechanical, and Plumbing Contractors. The Electrical (E) Contract includes providing all labor, materials, machinery, tools, equipment, and other means of construction for building power, lighting, and controls including a new 400 amp service and generator. Question Acceptance Deadline 10/17/2024 12:00 PM EDT Questions are submitted online Yes The General (G) Contract includes providing all labor, materials, machinery, tools, equipment, and other means of construction for an approximately 3,600 square foot new pre-engineered metal building (PEMB) including site work, foundations, and interior finishes. (PEMB scope is not in this contract). The Mechanical (H) Contract includes providing all labor, materials, machinery,tools, equipment, and other means of construction for building heat and ventilation including unit heaters,fans, and louvers. The Plumbing (P) Contract includes providing all labor, materials, machinery, tools, equipment, and other means of construction for building domestic water and sanitary sewer. The Electrical (E) Contract includes providing all labor, materials, machinery, tools, equipment, and other means of construction for building power, lighting, and controlsincluding a new 400 amp service and generator. All work is to be substantially completed 300 days after contract execution. Participation Requirements - Minority Business Participation - Women-Owned Business Participation General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Employee Background Checks Required - Installation Required - Insurance Required - Material Safety Data Sheets Required - Prevailing Wage Required - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % -- Each bid must be accompanied by a bid security in the amount of five percent of the base bid in accordance with the Instructions to Bidders. If a bid deposit is not submitted with the bid, the bid may be deemed incomplete and may not be considered. The successful Bidder will be required to furnish construction performance and payment bonds in the full amount of the contract price.
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$473,808.00
Public - City
Remodeling
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
