Published July 21, 2025 at 8:00 PM

Updated July 22, 2025

Site work and new construction of a water / sewer project in Feura Bush, New York. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Reference Number 0000386503 The Water Supply Fluoridation Project involves two Prime Contracts (General Construction and Electrical Construction) for which architectural and engineering design have been completed. The project includes providing all labor, materials, machinery, tools, equipment and other means of construction to install a new fluoridation system at the City's Feura Bush Water Filtration Plant. The construction involves, but is not limited to, the following work: site excavation, earth moving and grading, modification and demolition of existing concrete below-grade vault structure, construction of new concrete foundations and exterior secondary containment tank area, construction of day tank building, installation of fluoride chemical injection system components (tanks, pumps, valves, piping, and instrumentation), installation of mechanical and plumbing system components, and installation of electrical system components. Question Deadline 05/27/2025 at 12:00 PM ET Questions are submitted online Yes .Questions pertaining to the bid package should be directed to Eric Hirschmann, P.E. of CHA Consulting, Inc. at ehirschmann@chasolutions.com. Participation Requirements - Minority Business Participation - Women-Owned Business Participation General Requirements - Bid Deposit Required - Certified Payroll - Contractors License Required - Installation Required - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Each bid must be accompanied by a bid security in the amount of five percent of the base bid in accordance with the Instructions to Bidders. If a bid deposit is not submitted with the bid, the bid may be deemed incomplete and may not be considered. The successful Bidders will be required to furnish construction performance and payment bonds in the full amount of the contract price. The City of Albany MWBE Subcontractor and Minority/Women Labor Participation Policy also applies to this project. Each contract has a MWBE subcontractor participation goal of 15%. Subcontractors may be City or State- Certified MWBEs. Note this percentage is not in addition to the NYSDOH participation. Each Contract also has a Minority/Women Labor Participation goal of 30% of the total labor force hours.

Bid Results

Water / Sewer

$90,000.00

Public - City

New Construction, Site Work

33

29

16

7

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
374
Active Projects
209
Bidding Soon
2,412
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2025

August 5, 2025

Project location map

501 Old Quarry Rd, Feura Bush, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.