BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Niagara on the Lake, Ontario. Completed plans call for site work for a bridge / tunnel.

Seeking experienced contractors to perform bridge painting, structural steel repair and deck drain downspout work on the Canadian side of the Whirlpool Rapids and Lewiston-Queenston Bridges For the Niagara Falls Bridge Commission. The Niagara Falls Bridge Commission seeks qualified contractors to perform spot painting, structural steel repairs and deck drain downspout extensions on the Canadian side of the Whirlpool Rapids and Lewiston-Queenston bridges. The work must be coordinated to maintain bridge operations at all times. All Contractors must be pre-qualified to submit tenders directly to the Commission; if your firm is not currently pre-qualified to complete work for the Commission and you wish to submit a tender for this project you must submit a completed prequalification form no later than October 17th, 2024; visit NiagaraFallsBridges.com, look under Services/Construction/Contractor Prequalification; follow instructions to submit a prequalification form. Once approved firms generally remain qualified to perform work for the Commission for a period of 3 years from the date of approval. It is anticipated that an Invitation to Tender for the project will be issued in mid-December 2024; firms pre-qualified to perform work for the Commission will receive a notification when the Invitation to Tender for Project is issued. Please contact Mr. Robert R Koert, Construction Manager for the Niagara Falls Bridge Commission (716-285-6322 x4130 or rkoert@niagarafallsbridges.com) for further information.

Post-Bid

Bridges / Tunnels

$500,000.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
112
Bidding Soon
2,547
All Active Projects
1,119
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

May 1, 2025

img_map_placeholder

Lewiston-Queenston Bridge, Niagara on the Lake, ON

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.